It depends on the size of the bags
7 cement bags per 1 cubic meter of concrete......
11 bags
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
26 bags
6 bags.... depending on the mix ratio
It depends on the size of the bags
7 cement bags per 1 cubic meter of concrete......
11 bags
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
26 bags
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
yes
it is 100 bags of sand/ballast
The answer will depend on how big (or small) the bags of sand are!
You would need 54 bags of 0.5 cubic feet pea gravel to equal 1 cubic yard.