90,000
The answer will depend on the size of the patio slabs.
The answer will vary slightly depending on assumptions: will the slabs have a space between them, and will you be cutting the slabs to fill fractions. 21 feet is equal to 14.2 of the 450 mm slabs. 19 feet is equal to 12.9 of the slabs. To complete the rectangular area, 14.2 x 12.9 = 183 slabs.
4 x 55 gallons per pallet
14
220 should do it.
40 slabs
42 slabs...
48+ breakages
How many 30 packs on a pallet
A case of ribs typically contains around 2 to 4 slabs, depending on the size and weight of each slab.
how many types of slabs
Joe needs 460 paving slabs to surrond the pond.
90,000
The answer will depend on the size of the pallet, the orientation of the boxes and how many layers can be stacked.
on a pallet of red clay brick there are 532
3x2-y=6 3x2-y=6