You need10.8/(the number of cubic feet of sand in each bag) bags.
3
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
You need to mention how deep you want the sand to be
A standard dump truck can haul approximately six cubic meters of sand. Sand and gravel are aggregates for foundations in Philippine construction.
it is 100 bags of sand/ballast
The answer will depend on how big (or small) the bags of sand are!
It depends on the weight of the sand, but on average, a 50 lb bag of sand equals approximately 0.0227 cubic meters. So, roughly there would be around 44 bags in 1 cubic meter of sand.
You need10.8/(the number of cubic feet of sand in each bag) bags.
Oh, what a lovely question! In a cubic meter, you can fit quite a few bags depending on their size. Imagine filling it with small bags, you might fit hundreds in there! Or if you have larger bags, maybe just a handful. It all depends on the size of the bags you're using, but isn't it wonderful to think about all the possibilities?
80
3
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
3 cubic meter
About One
With dry sand. 1.602 tonnes
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over