A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.
4 inches = 0.1016 metres. So volume = pi*r2*h = pi*(17/2)2*0.1016 = 23.1 cubic metres (approx)
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
(60" x 100" x 6") = 36,000 cubic inches
500 sq ft X 1/12 ft / 27 cubic ft./cubic yard = 1.5 cubic yards
1 cubic meter
0.8
3 cubic meter
1 cubic meter of fine sand is equal to 1.25 tons
Loose dry sand is about 1.5 tonnes per cubic meter, so a tonne of sand would be about two thirds of a cubic meter.
Depends on what it's a cubic meter of. A cubic meter of hay will be much lighter than a cubic meter of sand.
80
Generally the rule of thumb for this is 2.5 to 1, meaning you would need 2.5 cubic meters of sand to manufacture 1 cubic meter of concrete.
3 cubic meter
1 cm3 (cubic metres) of sand is equal to 35.3 ft3 (cubic feet).
10kilograms