one bag
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.
To properly answer this question, one would need to know the volume of a "bag", since "bag" isn't any standard of volume or weight. Typical Portland Cement has a density to 1505kg / cubic meter. In addition, one would also need to know the coarseness of the gravel, as the ability of the sand and cement to fill in the aggregate depends heavily on the average size of the gravel pieces.
A LOT! Gunnite is make by mixing cement, sand, and water in an approximate ratio of 1 part cement to 4-6 parts sand with 1 part water using a high pressure spraying mechanism. Please note that the major component in gunnite is SAND and not cement. With this as a guideline, a 50 pound bag of cement would be mixed with at least 200 pounds of cement (approximate total mixture weight of 250 pounds). Thus,it would require approximately 8 such mixtures to equal 2000 pounds (2000 divided by 250 = 8) and since there is one bag of cement per mixture, it would require around 8 bags or 400 pounds of cement. Furthermore, one 250 pound mixture (containing one bag of cement) will cover approximately 5 square feet at a depth of 1 inch. So, to build a pool of any decent size, you will need MANY TONS of gunnite. Hope this helps ...
So you get the volume of one brick. Measure the length, width and height of one brick. Convert each to metres (/100 is you measured in centimetres). Now divide a cubic metre by the volume of 1 brick to get how many bricks would make a completely filled in cubic metre. Keep in mind, this method does not count any cement needed to secure the bricks
26 bags (40kgs cement bag)
42.7kg, or 94 pounds. BTW, a bag of portland cement contains one cubic foot of the product.
18
225
i want to know how much head pan is there in one 50 kg bag of cement. plse answer urgently
As of April 2012, one bag of cement cost approximately Php: 200 or about US$ 4.60 in the Philippines
To calculate the density of cement, you need to know the mass of the cement and its volume. Divide the mass of the cement by its volume to get the density. The density of cement is typically around 1,440 kg/m³.
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.
It is usually 50kg.
Rs: 1800
First you need to work out how many square meters are in the path. To do that multiply 21 by 2.5 21 X 2.5 = ?sqm You know one bag of cement will cover 10 sqm so to find out how many bag are needed for the path divide the answer of 21 X 2.5 by 10 ?/10 = 6 bags
This all depends on the mix you want. I assume you mean cement when you mention the 80lb bag of concrete. I have pushed concrete in my day... Bag cement mix is the same as concrete. Don't be funny. How many 80 pound bags will make 1 yard of concrete? I want a definitive answer this time.