500 cubic feet
43,200 cubic inches.
65 x 45 x 25 divided by 27 cubic feet in a cubic yard = 2,708 cubic yards
To convert cubic feet (cft) to cubic feet (ft³), note that 25 cubic feet is simply 25 ft³ since both measurements are in the same unit. If you meant to ask how to convert cubic feet to another unit, please specify which unit you are interested in, such as cubic meters or liters.
The total cubic feet the refigirator takes up is all you can calculate from this information. 25''x28''x66''=46200 cubic inches 1728 cubic inches = one cubic foot. 46200/1728=26.73 cubic feet
This question has already been answered in detail and the answer is: 25.13274123 rounded to 25 cubic feet.
25 cubic yards is 675 cubic feet.
25 gallons is 3.34 cubic feet.
25 US gallons is 3.342 cubic feet.
882.9 cubic feet.
25 US gallons = about 3.34 (3.34201389) cubic feet.
25 US gallons equals 3.342 cubic feet.
25 feet x 50 feet x 4 inches = 416.25 cubic feet
43,200 cubic inches.
To calculate the amount of concrete needed for a space measuring 10 feet by 25 feet by 4 feet, multiply the dimensions together: 10 ft x 25 ft x 4 ft = 1,000 cubic feet. Since concrete is typically measured in cubic yards, convert cubic feet to cubic yards by dividing by 27 (there are 27 cubic feet in a cubic yard). Thus, 1,000 cubic feet is approximately 37.04 cubic yards of concrete needed.
25 Cubic feet
65 x 45 x 25 divided by 27 cubic feet in a cubic yard = 2,708 cubic yards
25 cubic feet = 43,200 cubic inches