1,036,800
You will need 200 cubic feet.
4 feet 2 inches
50 feet equals 600 inches.
600 inches
50 feet * 12 inches = 600 inches. ■
600 US gallons = 138,600 cubic inches = 80.208333... cubic feet = 2.9707 cubic yards. (rounded)
600 cubic feet.
To calculate the amount of DG (decomposed granite) needed, first convert the depth from inches to feet: 3 inches is 0.25 feet. Then, multiply the area by the depth: 600 sq ft × 0.25 ft = 150 cubic feet. Since DG is typically sold by the cubic yard, divide by 27 (the number of cubic feet in a cubic yard): 150 cubic feet ÷ 27 ≈ 5.56 cubic yards. Therefore, you will need approximately 5.6 cubic yards of DG to cover 600 square feet at a depth of 3 inches.
To calculate the amount of concrete needed for a 20 by 30 slab, first determine the area in square feet: 20 feet × 30 feet = 600 square feet. If the slab is, for example, 4 inches thick, convert the thickness to feet (4 inches ÷ 12 inches/foot = 0.33 feet). The volume in cubic feet is then 600 square feet × 0.33 feet = 198 cubic feet. Finally, convert cubic feet to cubic yards by dividing by 27 (since there are 27 cubic feet in a cubic yard): 198 ÷ 27 ≈ 7.33 cubic yards of concrete needed.
You will need 200 cubic feet.
4 feet 2 inches
cubic meters?? 600 x 123 x 2.543 /1003 = 16.99 cubic meters
50 feet equals 600 inches.
0 inches and 50 feet!
600 inches
The question needs to be clarified or corrected: feet per hour is [Length]/[time], and cubic inches per minute is [Length³]/[time]. They are not dimensionally equivalent.
12 inches=1 foot 600 inches