You need to specify the slab's width and the length as well.

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Math & Arithmetic

How many yards of concrete for a 10' by 10' slab 6 inches deep?

To calculate the volume of concrete needed for a 10' by 10' slab that is 6 inches deep, first convert the depth to feet: 6 inches is 0.5 feet. The volume in cubic feet is then calculated as 10' x 10' x 0.5' = 50 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 50 ÷ 27 ≈ 1.85 cubic yards of concrete is needed.


How much concrete is needed for a 14 x 3 x 2 inch deep walkway?

84 cubic inches!


How many yards of concrete will be needed to fill in 400 square feet?

It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.


How many square feet will a yard of concrete cover 5 inches thick?

A cubic yard is 46,656 cubic inches. Spread to a thicknes of 5 inches, a cubic yard of concrete covers 9332.1 square inches, which is 64.8 square feet.


How do you measure cubic yds concrete in a circumference area?

To measure the concrete needed for a circular pad:-- Decide how thick (deep) the pad is to be. If it's in inches, divide by 12 for thickness in feet.-- Measure either the circumference or the diameter of the circle, in feet.-- If you measured the circumference, then the cubic yds of concrete needed is(0.00295) x (circumference) x (circumference, again) x (thickness) ... all in feet-- If you measured the diameter, then the cubic yds of concrete needed is(0.0291) x (diameter) x (diameter, again) x (thickness) ... all in feet

Related Questions

How much concrete do you need to fill a hole that is 26 x 26 x 36?

To find the volume of concrete needed to fill a hole measuring 26 inches by 26 inches by 36 inches, you can use the formula for volume: length × width × height. In this case, the volume would be 26 × 26 × 36 = 24,576 cubic inches. To convert this to cubic feet, divide by 1,728 (the number of cubic inches in a cubic foot), resulting in approximately 14.2 cubic feet of concrete needed.


How many yards of concrete for a 10' by 10' slab 6 inches deep?

To calculate the volume of concrete needed for a 10' by 10' slab that is 6 inches deep, first convert the depth to feet: 6 inches is 0.5 feet. The volume in cubic feet is then calculated as 10' x 10' x 0.5' = 50 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 50 ÷ 27 ≈ 1.85 cubic yards of concrete is needed.


How much concrete for 715 sq ft 4 in thick?

To calculate the amount of concrete needed for a 715 square foot area with a thickness of 4 inches, first convert the thickness from inches to feet: 4 inches is 1/3 of a foot. Next, multiply the area by the thickness: 715 sq ft × (1/3 ft) = approximately 238.33 cubic feet. Since concrete is typically ordered in cubic yards, convert cubic feet to cubic yards by dividing by 27, which gives about 8.81 cubic yards of concrete needed.


How much concrete to do a 60x60x4 thick slab?

To calculate the amount of concrete needed for a slab measuring 60 inches by 60 inches with a thickness of 4 inches, first convert the dimensions to feet: 60 inches equals 5 feet, and 4 inches equals 0.33 feet. The volume of the slab is then calculated as length × width × thickness, which is 5 ft × 5 ft × 0.33 ft = 8.25 cubic feet. To convert this to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard), resulting in approximately 0.31 cubic yards of concrete needed.


How many 40 Lb bags of concrete are needed to fill a container 42in x 42 in x 3 in?

To find the number of 40 lb bags of concrete needed, first calculate the volume of the container in cubic inches: 42 in x 42 in x 3 in = 5,292 cubic inches. Since there are 1,728 cubic inches in a cubic foot, the volume in cubic feet is 5,292 / 1,728 ≈ 3.06 cubic feet. A 40 lb bag of concrete typically covers about 0.30 cubic feet, so 3.06 / 0.30 ≈ 10.2 bags are required. Therefore, you would need approximately 11 bags of concrete.


How many yards of concrete is needed for 361 square yards 4 inches deep?

40.1 cubic yards


How much concrete to cover 3000 sq ft 6 inches thick?

To calculate the amount of concrete needed to cover 3,000 square feet at a thickness of 6 inches, first convert the thickness from inches to feet: 6 inches is 0.5 feet. Then, multiply the area by the thickness: 3,000 sq ft × 0.5 ft = 1,500 cubic feet of concrete. To convert cubic feet to cubic yards (since concrete is typically measured in cubic yards), divide by 27: 1,500 cu ft ÷ 27 = approximately 55.56 cubic yards. Therefore, you will need about 56 cubic yards of concrete.


How Much Concrete is Needed For a Slab 625 Square Feet by 6 Inches Thick?

625 times 0.5 = 312.5 cubic feet will be needed


How much concrete is needed for a slab 120 square feet by 3.5 inches thick?

(3.5/12) x 120 = (.2917) x 120 = 35.004 Cubic Feet Concrete is sold by the cubic yard. 35.004 cubic feet = 1.3 cubic yards


How much concrete is needed for a 14 x 3 x 2 inch deep walkway?

84 cubic inches!


How much grout does it take to fill a 6x8x16 block?

To calculate the amount of grout needed to fill a 6x8x16 concrete block, first determine the volume of the block in cubic inches: 6 inches (height) x 8 inches (width) x 16 inches (length) = 768 cubic inches. To convert this to cubic feet, divide by 1,728 (the number of cubic inches in a cubic foot), which results in 0.444 cubic feet. Therefore, approximately 0.444 cubic feet of grout is needed to fill one 6x8x16 block.


How much concrecrete do i need for 500sq ft at 4 inches thick?

To calculate the amount of concrete needed for a 500 square foot area at 4 inches thick, first convert the thickness to feet: 4 inches is equal to 1/3 foot. Then, multiply the area by the thickness: 500 sq ft x (1/3 ft) = approximately 166.67 cubic feet. Since concrete is typically ordered in cubic yards, divide this by 27 (the number of cubic feet in a cubic yard), which gives you about 6.17 cubic yards of concrete needed.