the answer is 1565 days a year has 365 days in it and a week has 7. 4 years have 1460 days because 365 * 4 = 1460 and 15 weeks have 105 days because 15 * 7 = 105. 1460 + 105 = 1565. if one of the years was a leap year then the answer will be 1564.
1,565 days 365 x 4 = 1460 days. 15 x 7 = 105 days. 1460 days + 105 days = 1,565 days.
fifteen 105 / 7 = 15
2 years and 316 days.
4 years and 14 days.
the answer is 1565 days a year has 365 days in it and a week has 7. 4 years have 1460 days because 365 * 4 = 1460 and 15 weeks have 105 days because 15 * 7 = 105. 1460 + 105 = 1565. if one of the years was a leap year then the answer will be 1564.
1,565 days 365 x 4 = 1460 days. 15 x 7 = 105 days. 1460 days + 105 days = 1,565 days.
about 105 days
fifteen 105 / 7 = 15
15 weeks 105/7=15
105 ÷ 12 = 8.75
There are 105 weekend days in 2011 :)
105 weekend days in 2012
2520 hours
252 / 24 = 10.5 days. There are 365 days in one regular year, therefore, rounded to two significant figures, this is equal to 105/3650 = 0.029 years.
There are 12 months in one year. Therefore, 105 months is equal to 105/12 = 8.75 years or 8 years 9 months.
8.75