= 48 weeks x 7 days = 48 x 7 = 336
336 days is 48 weeks.
6 weeks and 6 days.
336 days / 7 days per week = 48 weeks
7 days = 1 week 342 days = 342/7 = 48.86 weeks (2 dp) or 48 weeks 6 days.
= 48 weeks x 7 days = 48 x 7 = 336
336 days is 48 weeks.
6 weeks and 6 days.
336 days / 7 days per week = 48 weeks
48 days = 6weeks and 6days
There are 48 week in 336 days
336/7 = 48 weeks
7 days = 1 week 342 days = 342/7 = 48.86 weeks (2 dp) or 48 weeks 6 days.
With a month being 28-31 days a 48 week period (336 days) would be approximately 11 months.
There are five business days per week. Given 240/5= 48, 240 days span 48 weeks. Since there are 7 days per week 48 weeks covers 336 calendar days. Therefore, 240 business days = 336 calendar days. This answer excludes holidays, which might add 5 to 10 days if considered.
340 ÷ 7 = 48 weeks 4 days
If you mean months, there are about 11 months in 48 weeks.