2 years and 4 months
2 years
(2 years) x (12 months per year) = 24 months24 months plus 4 months = 28 months
1 month= 12 months 30 months = 2 years 6 months= 2 1/2 or 2.5 years
12 + 12 + 9 = 33 2 years 9 months
if there's 12 months in a year than its 2 years old.
2 years. 1 year is 12 months.
365 x 2 + 60 = 790 days (give or take depending on the months )
-1
2 years and 16 weeks. So around 2 1/4 years. There are 52 weeks in a year, and around 4-5 weeks in a month.
Assuming that neither of the years is a leap year, and that the month is a thirty-one day month: (2 x 60 x 24 x 365) + (31 x 24) + (20 x 24) = 1052424 hours
60