5ton
1
250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel.
You will need about 65.185 cubic yards (83.6 tons) of gravel for this area.
You'll need about 28.704 cubic yards (37 tons) of gravel.
5ton
To cover 300 square feet 4 inches thick, you would need approximately 3 cubic yards of gravel.
At 12" depth, 20 tons of gravel will cover 360 sq ft.
1
250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel.
You will need about 65.185 cubic yards (83.6 tons) of gravel for this area.
You would need about 5 cubic yards. Gravel is usually sold by the ton. I do not know that conversion. Who ever would deliver it for you should be able to help. If I were using crushed concrete I would use 15 tons... but I can not spread it 1" thick either.
Approximately 24.7 cubic yards or 31.7 tons of gravel.
8
You'll need about 28.704 cubic yards (37 tons) of gravel.
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
You will need about 463 cubic yards (around 594 tons) of gravel for this area.