250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel.
4 inches = 1/3 foot27 cubic feet = 1 cubic yardVolume = 80 x 1/3 x 1/3 = 88/9 cubic feet = 0.329 cubic yard (rounded)
5.16 yd^3 (when they say a "yard" of gravel, they mean a cubic yard).
You will need 20 cubic yards or 25.7 tons of gravel.
(2222/9) times (the weight of 1 cubic yard of gravel, in tons)
It depends on how thick you want the gravel to be. All dimensions will be in feet. (fractions) Width x length x depth divided by 27 equalls cu. yds.
76.00
250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel. 250 feet times 8 feet is 2000sqft, times one inch thick is 166.67 cuft. 166.67 cuft is 6.17 yards. Stone weight approximately 1.25 tons per yard. Therefore, at an inch thick, you need 7.71 tons of pea gravel.
4 inches = 1/3 foot27 cubic feet = 1 cubic yardVolume = 80 x 1/3 x 1/3 = 88/9 cubic feet = 0.329 cubic yard (rounded)
If you use a depth of 3 inches, that area will be about 16.2 cubic yards (around 20.785 tons) of gravel.
5.16 yd^3 (when they say a "yard" of gravel, they mean a cubic yard).
If you walk 4 miles per hr how long will it take you to walk a 1mile
You will need 20 cubic yards or 25.7 tons of gravel.
A yard of gravel is 27 cubic feet. 55 by 3 is missing a third dimension. what ever the third dimension should be multiplied by the 55 and 3 then divided by 27 to get your answer.
4inches
It depends on the thickness and the density. One ton should be about 15 cubic feet when compacted, so it would cover 30 square feet 6 inches thick or 45 square feet 4 inches thick or 60 square feet 3 inches thick. It would make a driveway four inches thick, 9 feet wide and 5 feet long or a footpath 3 inches thick, three feet wide and 20 feet long.
660 feet as long as a city block.