You are mixing volume (square yard) and area (length x width). How deep do you want the dirt? One foot deep you need about 80 square yards of dirt.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

If you figured an area is 600 cubic yards how many yards of dirt do you need to fill that area?

To calculate the volume of dirt needed to fill the area, you would need to know the depth of the area in yards. If the depth is 3 yards, then you would need 1800 yards of dirt (600 cubic yards ÷ 3 yards). If the depth is 1 yard, then you would need 600 yards of dirt.


How many cubic yards of dirt is a football field?

None. Just build the baseball field where the dirt is already there.


How much dirt in a square yard?

You can measure the surface of the dirt in square yards. That would be nine square feet.However the volume or amount of dirt cannot be measured in square yards or square feet. The amount of dirt in a volume of one cubic yard would be 27 cubic feet. ( 3x3x3=27 )The amount of dirt in a square yard to a depth of 0.5 feet would be 4.5 cubic feet. (3x3x0.5=4.5)


How big of an area will 1 ton of dirt cover 3 inches thick?

Roughly 12 square yards.


How many cubic yards of dirt will it take to fill an area 12 inches wide by 25 feet long by 4 inches high?

Sorry the first answer was in square yds. Cubic yards would be 0.308639


How much dirt is needed to raise 1 acre by 8 inches?

To raise 1 acre by 8 inches, you would need approximately 2,722 cubic yards of dirt. This calculation is based on the formula for volume of a rectangular prism (length x width x height) multiplied by the area of 1 acre in square yards (43,560 square feet).


How many bags of dirt are needed to fill a hole 27 ft long 4 ft wide and 6 inches deep?

This question cannot be answered. An area is "square", a volume is "cubic". The question asks about the volume of an area... and is meaningless. A square yard contains 9 square feet An area 30 feet by 50 feet contains 1,500 square feet or 166.67 square yards


How many yards of fill dirt in area 25x40x4 inches thick?

To calculate the volume of fill dirt needed, convert all measurements to yards: 25 feet x 40 feet x (4 inches/36 inches) = 111.11 cubic yards. Therefore, you would need approximately 111.11 cubic yards of fill dirt for the area.


How do you calculate the amount of stone that is needed to cover 7000 sq ft of dirt with 4 inches of stone as measured in yards... I would guess they mean cubic yards?

Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)


Yards of dirt are there in an acre of land?

There are 43,560 square feet in an acre of land. To determine the volume of dirt in an acre, you would also need to know the depth of the dirt. If you assume a depth of 1 foot, then there would be 43,560 cubic feet of dirt in an acre.


How many yards of dirt would it take to fill an area 15 feet long by 5 feet wide and 1 foot deep?

About 3 yards with a little left over. 2.78 yards.


How big is 400 yards of dirt?

400 yards of dirt would be a pile that is 1 yard wide, 1 yard tall, and 400 yards long. This would equate to roughly 1,200 cubic yards of dirt.