Approximately 6' X 9'.
1 (cubic yard) = 46 656 cubic inchesIf the depth is 2 inches then the area it will cover is 46656/2 square inches = 23,328 square inches. Convert 23,328 square inches to square yards23 328 (square inches) = 18 square yards
4.4 bags for each 1-foot deep. 2.2 bags for each 6-inches deep. Each 5-ft3 bag will cover the area to 2.72 inches deep.
An area 10 foot x 10 foot is 100 square feet. 100 cubic feet of sand would cover it with a one foot deep layer of sand. If the sand needs to be 6 inches deep, then 50 cubic feet are be needed, or 25 cubic feet if the sand is to be 3 inches thick.
1 cubic yard equals 27 cubic feet. At a six inch depth 1 cubic foot will cover 2 square feet, so 27 cubic feet will cover 54 square feet.
2.37 cubic yards of stone for every 3 inches deep it needs to be
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
160 cubic inches / (1/8 inches) = 160*8 = 1280 sq inches
1 (cubic yard) = 46 656 cubic inchesIf the depth is 2 inches then the area it will cover is 46656/2 square inches = 23,328 square inches. Convert 23,328 square inches to square yards23 328 (square inches) = 18 square yards
4.4 bags for each 1-foot deep. 2.2 bags for each 6-inches deep. Each 5-ft3 bag will cover the area to 2.72 inches deep.
240 x 3 /12 Cubic feet = 60 cubic feet
You will need 1500 cubic feet.
An area 10 foot x 10 foot is 100 square feet. 100 cubic feet of sand would cover it with a one foot deep layer of sand. If the sand needs to be 6 inches deep, then 50 cubic feet are be needed, or 25 cubic feet if the sand is to be 3 inches thick.
1 cubic yard equals 27 cubic feet. At a six inch depth 1 cubic foot will cover 2 square feet, so 27 cubic feet will cover 54 square feet.
You would need 31.88 cubic yards of topsoil to cover 855 sq feet at 6 inches deep.
To determine how much area 76.9 cubic feet covers at a depth of 12 inches, first convert the depth to feet: 12 inches is 1 foot. Then, divide the total volume by the depth: 76.9 cubic feet ÷ 1 foot = 76.9 square feet. Therefore, 76.9 cubic feet will cover an area of 76.9 square feet at a depth of 12 inches.
You will need about 463 cubic yards (around 594 tons) of gravel for this area.
2.37 cubic yards of stone for every 3 inches deep it needs to be