volume of trench = 10' x 3' x 54' = 1620 cubic feet

therefore 1620 cubic feet of concrete will be required.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How much concrete is needed area 20ft long by 12inches wide and 4 inches deep?

0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.


How deep is the Challenger Deep in the Mariana Trench the deepest point in the oceans?

Challenger Deep is a very deep spot on Mariana's Trench. Mariana's Trench is very long and Challenger Deep is just a tiny part of it, considered the deepest part.


What is the definition for the word trench?

A long, narrow deep ditch.


What is a wide deep trench hundreds of miles long and in the African landmasses?

There is a wide deep trench over 3 thousand miles long that goes from Turkey south almost to South Africa. It is called The Great Rift Valley.


What are the characteristics of ocean trench?

An ocean trench is a long, deep depression in the ocean. They are the result of oceanic plates sliding under one another.


How much concrete is needed for a space 5ft wide by 25ft long by 4 inches deep?

1.54321 cubic yards See the related link below


What is a long deep steep depression in the sea floor where subduction occurs called?

A trench.


What is a deep ocean trenches?

A deep ocean trench is a deep underwater canyon. It is found at the deepest parts of the ocean. It is long, thin, and has steep sides.


How long was the average trench?

As long as it needed to be to "hold the front". Some of the trenches went on for miles.


How long is a trench that is 3 feet across 6 feet deep and 400 miles long?

400 miles


How much concrete would it take to fill a trench 25' long x 10' wide x 6 thick?

1,500 ft.


What is trench stretch?

A trench stretch is a long system of trench.