21
At $2.79 per cubic meter, it's $837 plus tax.
You cannot convert cubic meters per second to meters per second. You cannot convert volume to length.
12 meters
To calculate the cost of 20 cm at 75p per meter, first convert 20 cm to meters, which is 0.2 meters. Then, multiply 0.2 meters by 75p per meter, resulting in a cost of 15p. Therefore, the cost of 20 cm is 15p.
(39 cm) / (100 cm per meter) = 0.39 meter
31.20. You multiply 5.2x6
It costs about $9.00 per cubic meter
100 centimeters per meter.
541 meters is 54,100 centimeters. (100 centimeters per meter)
The question, as stated, cannot be answered sensibly. A square metre is a measure of area, with dimensions [L2]. A cubic metre is a measure of volume, with dimensions [L3]. The two measure different things and basic dimensional analysis teaches that you cannot convert between measures with different dimensions such as these without additional information. If you have the length and breadth of the timber, you will need the average width (or height).
1 km = 1000 meters 1 meter = 0.001 km
120,000,000 millimeters is 120,000 meters.
At $1.29 per meter, it's $1,283.55 plus tax.
120 dollars
If a sari uses 3.58 meters of material and the material costs 6.98 per meter you calculate the cost: 3.58 meters x 6.98 per meter = 24.9884 24.9884 or if rounded to whole pennies 24.99
At $2.79 per cubic meter, it's $837 plus tax.
You cannot convert cubic meters per second to meters per second. You cannot convert volume to length.