You will need 20 cubic yards or 25.7 tons of gravel.
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
218.75 cubic feet or 8.1 cubic yards
13 1/4
You'll need about 28.704 cubic yards (37 tons) of gravel.
You will need about 463 cubic yards (around 594 tons) of gravel for this area.
You will need 65.93 cubic yards or 84.6 tons of gravel.
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
218.75 cubic feet or 8.1 cubic yards
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
16.36 cubic yards.
13 1/4
2 inches = 1/6 foot Volume = 3,500/6 = 5831/3 cubic feet = 21.605 cubic yards
40.1 cubic yards
You will need about 463 cubic yards (around 594 tons) of gravel for this area.
You'll need about 28.704 cubic yards (37 tons) of gravel.
It depends how deep you go. If you do 2 inches deep the area will require at least 0.7 cubic yards (about 1,710 pounds) of gravel.
To find the volume of gravel in cubic yards, first convert the depth to yards: 2 inches is 1/6 yard. Then, multiply the dimensions to get the volume in cubic yards: 5 yards wide x 28 yards long x 1/6 yard deep = 23 1/3 cubic yards. Since 1 cubic yard is equal to 1,296 square inches, multiply the volume by 1,296 to convert to square inches: 23 1/3 cubic yards x 1,296 = 30,158.22 square inches. Finally, divide by 9 to convert square inches to square yards: 30,158.22 square inches / 9 = approximately 3,350.91 square yards of gravel.