Ten cubic feet will do the job!
Chat with our AI personalities
92.593 cubic yards for every inch deep.
13 1/4
Plan on about 2.2 cubic yards (2.8 tons) of gravel.
You will need about 463 cubic yards (around 594 tons) of gravel for this area.
You'll need about 28.704 cubic yards (37 tons) of gravel.