5760 cubic feet of stone.
Chat with our AI personalities
2.37 cubic yards of stone for every 3 inches deep it needs to be
It would cover 5 sq. ft. one foot deep, or 60 sq. ft. one inch deep.
350
1440 minutes
162 sq.ft. Basically each sq foot of coverage will require a 2 inch "slice" off a cubic foot of stone. There are 27 cu.ft of stone in a cu. yd. and 6 "slices" per cu ft. so 6x27=162