not enough information
About 26 mins 35 secs (26.6 mins). In 1 minute, Janet will shovel 1/45 of the snow and Bill will shovel 1/65. Thus in 1 minute, working together they will shovel 1/45 + 1/65 = 22/585 of the snow. Thus to shovel all the snow will take: 585/22 minutes = 2613/22 minutes ~= 26 mins 35 secs.
To calculate the hours and minutes worked you could simply start a timer when you get to work and stop it when you leave. Do this every day until it is time to turn in your hours and minutes worked. The amount on the timer will be your total.
5 hours
If you worked from PM to 12:15 AM, that would be a duration of 1 hour and 15 minutes. The time span includes the hour from the starting PM hour to midnight and an additional 15 minutes into the new day.
(worked_it_out_myself)">about 3 hours and 35 minutes (worked it out myself)220 minutes is exactly 3 hours and 40 minutes. 60 minutes (one hour each) times 3 = 180. 40 minutes remain.
About 26 mins 35 secs (26.6 mins). In 1 minute, Janet will shovel 1/45 of the snow and Bill will shovel 1/65. Thus in 1 minute, working together they will shovel 1/45 + 1/65 = 22/585 of the snow. Thus to shovel all the snow will take: 585/22 minutes = 2613/22 minutes ~= 26 mins 35 secs.
Sue shovels (1/40th) of the driveway each minute.Tom does (1/55th) of the same job each minute.Together, they do (1/40 + 1/55) = (11/440 + 8/440) = (19/440) of the job each minute.It would take them (440/19) = 23.16 minutes to do the whole job together. (rounded)
2.5hrs :) * * * * * Should be :( since that is the WRONG answer - as a simple credibility check on the answer would tell you. If they work together, how can it take longer than Sam doing it alone? Sam can do the driveway in 2 hours so Sam does 1/2 driveways per hour. Max can do the driveway in 3 hours so Max does 1/3 driveways per hour. So Sam + Max do 1/2 + 1/3 = 5/6 driveways per hour. To do 1 driveway would, therefore, take them 1/(5/6) = 6/5 hours = 1.2 hours or 1 hour 24 mintes.
they worked together on the way, they worked together when they were building shelter, and they worked together to deliver letters.
Scientists have worked together in many ways in the past.
To calculate the hours and minutes worked you could simply start a timer when you get to work and stop it when you leave. Do this every day until it is time to turn in your hours and minutes worked. The amount on the timer will be your total.
The French and the U.S. worked together to build the Panama canal.
The French and the U.S. worked together to build the Panama canal.
No, they worked together and developed ideas together.
Yes, it did for me. Worked withn minutes
Other than documentaries and award shows, the two have never worked together on any project.
The people who play rachel berry and Jesse from vocal adrenaline have worked together before in various musical though im not sure if they worked together in that particular one.