4.50 is the same as 4.5 hours which is 4 hours and 30 minutes
It is: (4*60)+30 = 270 minutes
450 minutes.
Oh, isn't that a lovely question. In 7 and a half hours, there are 450 minutes. You see, for each hour, we have 60 minutes, and when we multiply that by 7 and add the extra 30 minutes from the half hour, we get a total of 450 minutes. Isn't that just delightful?
If it was 100k per hour, then 750k would mathematically be 7 and a half hours, 7 hours 30 minutes, or 450 minutes.
Thirty hours plus thirty minutes can be expressed as 30.5 hours. In a more standard format, this is equivalent to 30 hours and 30 minutes. If represented in hours and minutes, it would be shown as 30:30.
Seven and a half hours. 7 hours 30 minutes
It is: (4*60)+30 = 270 minutes
None, but there are 450 minutes in 71/2 hoursTo find this:Divide 450 by 60 (450 / 60)That equals 7.5.But how do we calculate this as precise hours and minutes?Take 7.5; this is 7.5 hours. The .5 is a half; so what's half of an hour? 30 minutes?So this becomes 7 hours and 30 minutes.Short method:450 / 60 = 7.5 = (.5 means half so 30 mins) = 7 hours and thirty minutes.
450 minutes.
7 hours 30 minutes.
60(hour)+60(hour)=120(2 hours)+60(hour)+60(hour)=240(4hours+30=270(4hours and 30 min)You have 4 hours and 30 minutes of a drive if some body is driving 60 miles an hour.
Oh, isn't that a lovely question. In 7 and a half hours, there are 450 minutes. You see, for each hour, we have 60 minutes, and when we multiply that by 7 and add the extra 30 minutes from the half hour, we get a total of 450 minutes. Isn't that just delightful?
4 hours 30 minutes.
450 seconds is 7minutes 30 seconds
If it was 100k per hour, then 750k would mathematically be 7 and a half hours, 7 hours 30 minutes, or 450 minutes.
really long its been installing for 30 minutes and its not finished
374 / 80 = 4.675 hours = about 4hours 41minutes At 80 miles per hour, add 1 to 2 minutes for each slowdown when the radar detector goes off, and 20 to 30 minutes to accept each citation.