4.50 is the same as 4.5 hours which is 4 hours and 30 minutes
300 minutes = 5 x 60 330 - 300 = 30 Answer: 5 hours 30 minutes
60 x 4 = 240 + 17 = 257 I conclude 257 minutes!
60 minutes = 1 hour 120 minutes = 2 hours 240 minutes = 4 hours 246 minutes = 4hours 6minutes
26.1 miles per hour.
4.50 is the same as 4.5 hours which is 4 hours and 30 minutes
4hours, 50 minutes
really long its been installing for 30 minutes and its not finished
Yes.
300 minutes = 5 x 60 330 - 300 = 30 Answer: 5 hours 30 minutes
60(hour)+60(hour)=120(2 hours)+60(hour)+60(hour)=240(4hours+30=270(4hours and 30 min)You have 4 hours and 30 minutes of a drive if some body is driving 60 miles an hour.
60 x 4 = 240 + 17 = 257 I conclude 257 minutes!
60 minutes = 1 hour 120 minutes = 2 hours 240 minutes = 4 hours 246 minutes = 4hours 6minutes
60 minutes in an hour so, 60X4=240 240 minutes in 4hours :) hope this helped
26.1 miles per hour.
From Chennai it takes 3hours 55 minutes.From Delhi it takes 6hours 10 minutes,and from Mumbai it takes 4hours 55 minutes
MapQuest estimates the driving time as 4hours and 47 minutes.