It is: (4*60)+30 = 270 minutes
Wiki User
∙ 8y ago4.50 is the same as 4.5 hours which is 4 hours and 30 minutes
300 minutes = 5 x 60 330 - 300 = 30 Answer: 5 hours 30 minutes
60 x 4 = 240 + 17 = 257 I conclude 257 minutes!
60 minutes = 1 hour 120 minutes = 2 hours 240 minutes = 4 hours 246 minutes = 4hours 6minutes
26.1 miles per hour.
4.50 is the same as 4.5 hours which is 4 hours and 30 minutes
really long its been installing for 30 minutes and its not finished
4hours, 50 minutes
Yes.
300 minutes = 5 x 60 330 - 300 = 30 Answer: 5 hours 30 minutes
60(hour)+60(hour)=120(2 hours)+60(hour)+60(hour)=240(4hours+30=270(4hours and 30 min)You have 4 hours and 30 minutes of a drive if some body is driving 60 miles an hour.
60 x 4 = 240 + 17 = 257 I conclude 257 minutes!
60 minutes = 1 hour 120 minutes = 2 hours 240 minutes = 4 hours 246 minutes = 4hours 6minutes
60 minutes in an hour so, 60X4=240 240 minutes in 4hours :) hope this helped
26.1 miles per hour.
From Chennai it takes 3hours 55 minutes.From Delhi it takes 6hours 10 minutes,and from Mumbai it takes 4hours 55 minutes
374 / 80 = 4.675 hours = about 4hours 41minutes At 80 miles per hour, add 1 to 2 minutes for each slowdown when the radar detector goes off, and 20 to 30 minutes to accept each citation.