by observing the task, discussing the task with workers, and using "lessons learned" from other mishaps
The term that most closely matches this description is "risk assessment." Risk assessment is a systematic process used to identify hazards, evaluate the potential harm they could cause, and analyze the likelihood of those hazards resulting in adverse outcomes. It involves assessing hazard severity, mishap probability, and exposure to determine overall risk levels.
A structured process to identify and assess hazards typically involves systematic steps such as hazard identification, risk assessment, and risk management. This process evaluates potential harm by analyzing hazard severity, which reflects the impact of an incident, mishap probability, indicating the likelihood of an occurrence, and exposure, which accounts for the frequency and duration of contact with the hazard. By quantifying these elements, organizations can prioritize risks and implement effective controls to mitigate them. Ultimately, this approach enhances safety and reduces the likelihood of accidents.
The probability is 0.The probability is 0.The probability is 0.The probability is 0.
The probability is 1.The probability is 1.The probability is 1.The probability is 1.
For any event A, Probability (not A) = 1 - Probability(A)
the mishap probability component is an estimation that a hazard will result in a mishap
the mishap probability and the hazard severity
hazard severity and mishap probability
There was a mishap robbery.
The mishap is when there are bumps in it
A mishap,a Misfortune
If nothing else, the mishap did serve to show where security procedures needed improvement.I had a slight mishap the other day at work.His mishap led to problems at school.I remember how horrible her mishap was.Who'd think such a small mishap could cause such a large dilemma.
Mishap means an unfortunate accident
That is the correct spelling of "mishap" (accident, unfortunate occurrence).
The mishap was avoided due to solid planning.
The Milker's Mishap was created in 1897-02.
A risk assessment, in the building trade for example, must be done before work can begin. It is to ensure that all possibilities of an accident or other mishap is forseen and so guarded against.