Wiki User
∙ 14y agoOversimplifying in the usual textbook manner:
The octagonal pier has eight faces, each 1 ft by 10 ft or 10 square feet.
Eight faces, each 10 square feet, requires 80 square feet.
Wiki User
∙ 14y ago2
12L
A cubic measure ment is required
A concrete calculator helps one determine how much concrete will be needed for a pour. To get an accurate reading, one needs to have the length, width and thickness desired.
0.2
How much concrete is required to fill 100 cu feet
It depends on the size of the concrete blocks
Required slump height of M20 for different concrete structures, are normally calculated by the required slump value, which would come out to be 100 lits.
Q1
2
concrete quantity is the amount of concrete required for the construction of an building but in shuttering area is the protection provided for our security
There are several reasons, but corrosion protection and concrete spauling are probably the most important factors.
50/3 cubic yds of concrete
no limited quantity, it depends on the volume required by the subject
Its the process of selecting suitable ingredients of concrete and determining their relative amounts with the objective of producing a concrete of the required, strength, durability, and workability as economically as possible, is termed the concrete mix design.
12L
1 archybald and sealyer