Machine # 1 works at a rate of 1/2 truckload per hour, while machine 2 works at a rate of 1/4 truckload per hour. The two machines together work at a rate of 3/4 truckload per hour complete the job 1/(3/4) = 1-1/3 hours.
45mls/hour
15 dollars/hour is the unit rate
Direct labor hour rate is the per hour wage rate paid to skilled or unskilled labor to make one unit of product.
The car is slowing down at a rate of 10 miles per hour for each hour it continues this rate.
hour rate
Machine hour rate of 200 ton machine is 200*1.125= ?
A machine hour rate is the cost of one machine working for one hour. This is used in calculating overhead costs to work in process as opposed to using labor hours.
how to calculate machine hourly rate
what are advantages and disadvantages of shapper machine
Machine # 1 works at a rate of 1/2 truckload per hour, while machine 2 works at a rate of 1/4 truckload per hour. The two machines together work at a rate of 3/4 truckload per hour complete the job 1/(3/4) = 1-1/3 hours.
willy
Human hour refers to the amount of time a human works or is productive in a given hour, while machine hour refers to the amount of time a machine operates within the hour. Human hours are measured based on human labor and productivity, while machine hours are based on machine operation and efficiency.
The disadvantages of using a shaper machine are s many. There are higher chances of injury that may cut deep into the skin.
The machine has a built in EKG hear rate monitor.
Contribution margin for per machine hour is as follows:total contribution margin / number of machine hours = contribution margin per hour
There are many pparameters taken into accont for getting machine hr rate like: Direct labour cost indirect labour cost machine cst(intial) depreciation tool, lubrication, coolant, ...etc and most importantly total m/c hr available