answersLogoWhite

0

The term "470 c 2000 concrete" typically refers to a specific type of concrete mix, where "470" denotes the compressive strength of the concrete in kilograms per square centimeter (kg/cm²) at 28 days, and "2000" indicates the characteristic strength in terms of a corresponding class or grade. This concrete is designed for structural applications, offering good durability and strength. The numbers suggest it is suitable for medium to high-strength construction projects.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Related Questions

How much is 470f in Celsius?

To convert Fahrenheit to Celsius, you can use the formula: Celsius = (Fahrenheit - 32) x 5/9. Plugging in the value of 470 Fahrenheit, the conversion would be: (470 - 32) x 5/9 ≈ 243.33 degrees Celsius.


Where is the amplifier located in a 2000 Lexus LX 470?

it is located under passenger sit.


When did laozi live?

he lived and died between 551-470 B. C. E.


What is the Quantity of water in 1m3 concrete?

it is W/C=.45 or W/C= .55 it is depends on the type of concrete


What has the author C Feeg written?

C. Feeg has written: 'Effects of reinforcement detailing for concrete masonry columns' -- subject(s): Concrete Columns, Concrete masonry, Reinforced concrete construction, Testing


What has the author John C Ropke written?

John C. Ropke has written: 'Concrete Problems' -- subject(s): Concrete


What is the degree celsius of 293k and 470k?

293 K is approximately 20°C, and 470 K is approximately 197°C.


What is 468 rounded to the nearest ten?

It is 470.


Why is it important to have workable concrete?

simply workabilty is the w/c ratio in concrete. more the w/c ratio higher the workability and vice versa. and it is true that excess amount of w/c ratio doesnt give proper strength. so workable concrete i.e, concrete with proper w/c is must for good strength. *note: not considering the mix of concrete.


Is heaven concrete or abstract?

c


What are the release dates for Forensic Files - 2000 Concrete Alibi?

Forensic Files - 2000 Concrete Alibi was released on: USA: 20 September 2006


WHAT IS 30 percent OF 470?

30% of 470= 30% * 470= 0.3 * 470= 141