how are temperature the amount of heat transferred and change in in temperature of related
At the start of fiscal period every organisation prepares budgets for the coming period and then use the same estimated budget at the end of fiscal year to evaluate the performence in the fiscal year. When actuall amount for any activity is utilized less then the budgeted amount estimated for the same activity at the start of the fiscal year and perform the same activity accurately as estimated at start of period with less amount then it is called favourable variance and vice versa.
56 is estimated to be 60.
17 is estimated to 20.
43.07 - 3.912 estimated = 39.158
Amount of what?
~$1400
An estimated 30 Million
There is an estimated amount of about 7 billion covenant units, about the same as Earth.
340 dollars.
It is a determined value or an estimate.
the estimated amount is almost 30 million people in just a country per year (that is just an estimated amount for me based on my observation here in my country)
Not necessarily. As stated, it is an estimated refund. Other factors may affect your refund that have not yet been taken into account. A tax professional can hep you find the exact amount you will get.
A "workload" is an amount of work that something is doing. An "estimated workload" will be an educated guess as to how much work something will be doing.
Just under the amount of people. A LOT.
10 years
Est 10.5 million people in 2001