Volume of concrete required, in square feet = 27 x 4 x 0.5 = 54 cu ft, which is 2 cubic yards, so 80 dollars/pounds/yen/ringgit or whatever.
A cubic measure ment is required
Find the cost. Find the volume. If necessary, convert to cubic inches. Divide the cost by the volume.
12 inches = 1 foot1 cubic yard = 27 cubic feet9 inches = 0.75 foot15 x 8 x 0.75 = 90 cubic ft = 3 and 1/3 cubic yardsI've never ordered concrete. but I suspect they'll charge you for 4 .Cost for 3-1/3 = $100Cost for 4 = $120
You calculate the total cost of 1 cubic meter reinforcement cement for heavy foundation work by adding all of the costs. Essentially you would have to figure out the total of pounds of concrete for 1 cubic meter multiply that by the cost per pound and then add in the cost of labor it takes to pour 1 cubic meter.
8.5 x 5.25 x 7 = 312.375 cubic inches
Essentially, you need three and a third cubic yards of concrete to replace that quantity to those measurements - so if the cost of a cubic yard of concrete is 30, multiply it by 3.333 and you get 100
how much does a cubic yard of concrete cost in atlanta georgia
FOR WINTER MIX CONCRETE IN THE NYC AREA AS OF FEBRUARY 2012 THE COST FOR 3200 psi CONCRETE IS $114 PER CUBIC YARD
285.00 CAD for each cubic yard
Concrete is sold in cubic (volume) measurements not square (area) measurements.
what is the cost per cubic yard of contrete in place with labor cost
55372
thatβs hard
87027
64151
As of May 25, 2014, the cost of concrete in Washington State is from $100 to $110 per cubic yard. Prices vary depending on the grade of concrete you buy and other factors.
27 cubic feet in one yard of concrete. $90.00 divided by 27cu.yds= $3.33/cu.ft.