Chat with our AI personalities
The volume of the raw material required for a certain machine part is 2.02 cu.cm. The finished volume is 1.05cu cm. The time for machining each piece is 45 seconds for steel and 30 seconds for brass. The cost of steel is P32.50 per kg and the value of steel scrap is negligible. The brass is P60.00 per kg and the value of scrap is P25.00 per kg. The wage of the operator is P40.00 per hour and the overhead costs of the machine is P50.00 per hour. The weight of steel and brass are 0.0081 and 0.0088 kg per cu cm, respectively. Which will you recommend?
what is the weight per cubic inch of W50 steel
The cost of a groyne per meter can vary significantly depending on various factors such as the type of material used, the size and design of the groyne, the location, and the construction method. On average, the cost can range from $500 to $2000 per meter for a typical timber or rock groyne. More durable and long-lasting materials like concrete or steel may cost more, potentially exceeding $3000 per meter. It is essential to consult with experts and obtain quotes from contractors to get an accurate estimate for a specific groyne project.
The cost of construction per square foot is the same as the cost of an automobile per inch of length.
Generally in marketing, it is the cost per 1000 on a production run.