Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.
30 X 40 + 1200 sq/ft
20-ft x 40-ft x 3-in = 20-ft x 40-ft x 1/4 foot = 200 cubic feet = 7.41 cubic yards
22 x 30 x 3.25 = 2145 cubic feet (2145 ft3)
4 inches = 1/3 foot27 cubic feet = 1 cubic yardVolume = (30-ft x 50-ft x 1/3-ft) = 500 cubic feet = 18 14/27 = 18.519 cubic yards (rounded)
Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.Volume of sand required = 6 ft * 5 ft * 1 ft = 30 cubic feet. A bag = 3 cubic feet so number of bags required = 30/3 = 10 bags.
To calculate the volume of concrete needed for the sidewalk, first convert the 4 inches thickness to feet (4 inches = 1/3 feet). Then, multiply the length (40 ft) by the width (3 ft) by the thickness in feet (1/3 ft) to get the total volume in cubic feet. This comes out to be 40 ft * 3 ft * 1/3 ft = 40 cubic feet of concrete needed for the sidewalk.
That is 187.5 cubic ft.
27 cubic feet is about 764.55 liters.
30 ft * 25 ft Is not a cubic function, but a squared function. = 750 ft2 =======
12 in = 1 ft → 40 in × 48 in × 60 in = (40 ÷ 12) ft × (48 × 12) ft × (60 × 12) ft = 10/3 ft × 4 ft × 5 ft = 200/3 cu ft = 66 2/3 cu ft ≈ 66.67 cu ft
30 X 40 + 1200 sq/ft
20-ft x 40-ft x 3-in = 20-ft x 40-ft x 1/4 foot = 200 cubic feet = 7.41 cubic yards
6 inches = 1/2 foot.27 cubic feet = 1 cubic yard60-ft x 30-ft x 1/2 ft = 900 cubic feet = 331/3 cubic yards
24' x 40' x 4 inches = 11.85 cubic yards.
22 x 30 x 3.25 = 2145 cubic feet (2145 ft3)
4 inches = 1/3 foot27 cubic feet = 1 cubic yardVolume = (30-ft x 50-ft x 1/3-ft) = 500 cubic feet = 18 14/27 = 18.519 cubic yards (rounded)