Although the terms are often used as synonyms they are not the same. A Gantt chart is a specific type of bar chart. Gantt did not invent the bar chart, the concept of bar charts pre-date Gantt's work by at least a century. The erroneous description of a bar chat as a Gantt chart and the belief that Gantt invented the bar chart probably results from the decision of Microsoft, in 1984/1985, to misname the bar chart view in its scheduling tool Microsoft Project as a Gantt chart. See 'Where did the Misuse of the names Gantt and PERT Originate?'. P Weaver. PM World Journal, Vol. II, Issue IV, (April 2013).
A Gantt chart is a bar chart, but a bar chart is not necessarily a Gantt chart.Bar chart is a much wider decription. It like asking "What's the difference between a fruit and an apple?". The apple is a fruit, but a fruit doesn't have to be an apple...
Tasks are usually show on a gantt chart, as well as the people who are assigned to the task, and of course the duration (starting date and end date). Gantt charts also display the dependencies between tasks.
They are almost same except directions, column chart are vertical type and bar chart are are horizontal.
I don't believe radar charts are used in mathematics.
A composite bar chart is whereby each bar displays multiple data points stacked in a single row or column. On the other hand multiple bar graph are usually placed side by side and use different shapes to contrast between them.
A Gantt chart is a bar chart, but a bar chart is not necessarily a Gantt chart.Bar chart is a much wider decription. It like asking "What's the difference between a fruit and an apple?". The apple is a fruit, but a fruit doesn't have to be an apple...
Gantt chart is a tool which is useful in scheduling the various activities of a project in the form of horizontal bar graph where as CPM provides a graphical view and network of events and activities in chronological manner.
PERT chart is a technique for scheduling a project based on individual tasks or activities whereas Gantt Chart is a bar chart that represents the tasks and activities of the project schedule.Source: Satzinger, J., Jackson, R., Burd, S. "Systems Analysis and Design in a changing world" Fifth Edition, Cengage Learning, Boston.
The Gantt Chart gets its name from its inventor Henry Gantt which he made in 1930. The Gantt Chart is a bar chart that illustrates project schedules. They are used for any projects that involve resource, milestones, effort, and deliveries.
Tasks are usually show on a gantt chart, as well as the people who are assigned to the task, and of course the duration (starting date and end date). Gantt charts also display the dependencies between tasks.
The Gantt chart was invented in the early twentieth century. It is a bar graph that shows start and end dates for projects.
Nothing
A Gantt chart is a type of bar chart that illustrates a schedule you have set for a project. They were first developed in the years 1910-1915. However, the first traces of these charts were noticed around 1896.
They are almost same except directions, column chart are vertical type and bar chart are are horizontal.
I don't believe radar charts are used in mathematics.
A pie chart is round, and a bar graph is square with the bars running either horizontal or verticle.
A composite bar chart is whereby each bar displays multiple data points stacked in a single row or column. On the other hand multiple bar graph are usually placed side by side and use different shapes to contrast between them.