A cubic yard = 3' x 3' x 3' = 27 cubic feet = 3888 cubic inches
A Yard of Concrete? what unit is this? Linear? Cubic? Front yard or back? I suppose it is a Cubic Yard of Concrete. The answer is (36/3)*9 = 108sf
A cubic yard is 46,656 cubic inches. Spread to a thicknes of 5 inches, a cubic yard of concrete covers 9332.1 square inches, which is 64.8 square feet.
What is the weight of one cubic yard of cement? If you are asking the weight of 1 cubic yard of CONCRETE it is approximately 2 tons or 4000 pounds per cubic yard when wet.
A yard of concrete is a measure of volume. A square foot is a measure of area. A cubic yard is 27 cubic feet of stuff. (3x3x3)To relate volume to area you must extend the area over a third dimension. One square foot that is one foot deep will equal one cubic foot. (1x1x1)So, a yard of concrete is 27 cubic feet or 3 feet tall 3 feet wide 3 feet deep. concrete wieghs 150lbs per cubic foot 27cubic feet times 150 pounds is 4050 pounds. This is 1 cubic yard of concrete.
1 "yard" of concrete actually = 1 cubic yard = 27 cubic feet27 = (2/3) x81 = 2 xx = 40.5 square feet
What cubic yard ?, concrete, topsoil, bananas,
The price of one yard of concrete is $75.00 a cubic yard.
The number of concrete blocks in a yard depends on the size of the blocks and the specific dimensions of the yard. Standard concrete blocks typically measure 16 inches long, 8 inches high, and 8 inches deep. A cubic yard is equivalent to 27 cubic feet, so you can fit approximately 70 standard concrete blocks in a cubic yard, considering the dimensions and factoring in any waste or spacing.
Definition of the amount of concrete that (by volume) will fill on cubic yard of space.
$70 - $100 per cubic yard depending on supplier.
as a rule of thumb, 1 cubic yard of concrete weighs about 4,000lbs or 2 short tons
A Yard of Concrete? what unit is this? Linear? Cubic? Front yard or back? I suppose it is a Cubic Yard of Concrete. The answer is (36/3)*9 = 108sf
Each 60 pounds bag of ready mix concrete will make .45 cubic foot of concrete. There are 27 cubic feet in a cubic yard. You will need 60 bags of 60 pound premixed concrete to make 1 cubic yard.
There are approximately 27 cubic feet in a cubic yard, and an 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, to fill one cubic yard, you would need about 45 bags of 80-pound concrete.
In the United States, if you are buying concrete mixed up and ready to pour, it is typically sold by the cubic yard (3ft x 3ft x 3ft) volume. But they usually call this just a 'yard' of concrete, knowing that it is a cubic yard.
how much does a cubic yard of concrete cost in atlanta georgia
That depends on what size the concrete truck is. A 10-yard truck carries about 270 cubic feet when full. An 8 cubic yard truck carries about 216 cubic feet of concrete. (Or gravel, sand, etc)