8.9 percent of 130 = 11.578.9% of 130= 8.9% * 130= 0.089 * 130= 11.57
130% of 60 = 130% * 60 = 1.3 * 60 = 78
20% of 130= 20% * 130= 0.2 * 130= 26
1x 130= 130 2 x 65= 130
130 + 15 = 145 130 - 15 = 115 130 x 15 = 1950 130/15 = 8.6666
Tolerances H7 23DIA for hile is +0.021/-0.000 ///MUKI
65 is dia of hole H-tolerance zone 7-tolerance grade for the value of the H7 checK hole tolarance chart for dia 65 under H7 free feel to contact for any query or mail me to mullapudi0331@gmail.com
0.007
H6 tolerance for 95 mm hole is +0.022/0
h stands for standard hole in tolerance
+0.021 -0.00
A 10h7 hole is designed with a basic size of 10 mm and a tolerance range of +0.033 mm to +0.058 mm. This means that the actual hole size could range from 10.033 mm to 10.058 mm.
http://wiki.answers.com/Q/What_is_The_tolerance_for_a_08mm_H12_hole"
According to ISO R286 The tolerance for a 16mm H9 hole is: 16mm +0.000mm 16mm +0.043mm
H7 for headlight. H7 for cornering lamp. H1 or H7 for main beam Hope this is of use to everyone.
ø60 mm (+0.348/+0.340)
It is the range on what is allowable on a dimension. If the tolerance on a Ø.500 hole is ±.003, the actual part could measure Ø.497 to Ø.503