40 psf
Chat with our AI personalities
A bracing connection is the fixing that holds bracing in place and to transfer loads into the bracing. Bracing holds the structure stable by transferring sideways loads (ie: not gravity, but wind or earthquake loads) down to the ground. It helps keep the structure upright and square when these loads come on to the building.
There are loads of similar questions like this on here. The way to work it out is...Multiply the area to be covered by 144 (the number of square inches in a square foot) then divide that figure by the size of the tile (in square inches) In this case it's...(171x144) divided by (13x13)Go on - there's the sum - you can do it !
3546
You will need 20,250 bags of soil.That's based on a typical bag of soil being 1 cubic foot. Going 6 inches deep. However this does not include soil compaction which is at least 25% depending on the density and moisture content in the bagged soil.Without Compaction factored in its just over 16,000 bags.About 600 cubic yardsAbout 40 Full Size Dump Truck Loads
what is it because there is loads