Wiki User
∙ 6y agoWant this question answered?
Be notified when an answer is posted
What is the Important of statistics to Accounting?
The object's surface area increases as extra surface which was before part of the inside of the object is exposed. If you found my answer helpful then please click recommend contributor :)
To get the accurate weight/mass before the objects gets wet.
The distance travelled by an object in a given time is given by:Distance = Speed * TimeAlternatively for an object that is accelerating:Distance = (Speed of object before acceleration is applied * Time) + (0.5 * Acceleration * Time squared)If the object is accelerating from speed zero, the first set of brackets is irrelevant.Also, if the object is falling to the ground, acceleration = 9.81
Volume displacement is the method used to find the volume of small or irregularly shaped objects by noting the difference in the level of liquid before and after after immersing an object into a graduated cylinder or beaker of liquid. The difference between the before and after levels of the liquid is the volume of an immersed object.
One technique used by drafters is that of multi-view drawings, which show an object from different viewpoints. Three views are common, but some simple structures only need one, while complex ones need four or more.
No, a multiview projection is used for developing a multiview drawing. Multiview projections are orthographic projection where the object is behind the plane of projection, and is oriented such that only two of its dimensions are shown.
a multiview drawing contains the top view, side view, and front view of an object. It also contains the isometric projection of the object.
The normal English construction is either: Give the money ( d.o.) to Bill (i.o.), where the direct object comes before the indirect object; or Give Bill the money, where the indirect object comes before the direct object. . There is no correct construction in English where a direct object precedes the indirect object without a preposition between them.
- verb (used with object) 1. to sell in advance, as before manufacture or construction
Object-Oriented Software Construction was created in 1988.
Knowing the density of an object is important because it helps in determining its weight and volume, which can be useful for various applications such as design, construction, and transportation. Density can also indicate the composition and material properties of the object.
Object-Oriented Software Construction has 1254 pages.
No, there is no indirect object in the sentence "The city closed your street during the construction." The city is the subject, "closed" is the verb, "your street" is the direct object, and "during the construction" is a prepositional phrase.
It is important to dry a wet object before finding its mass because the water on its surface can add extra weight and affect the accuracy of the measurement. Drying the object ensures that you are weighing only the object itself, without any added moisture.
Knowing the density of a substance is important for daily life because it can help in the identification of materials, determining if an object will sink or float in a liquid, calculating the volume of an object, and in various scientific and industrial applications such as cooking, construction, and manufacturing.
WHY IS IT IMPORTANT THAT THE IMAGE IS CENTERED IN THE FIELD OF VIEW BEFORE SWITCHING TO A HIGHER POWER