Coverting cubic feet into cubic inches first: 1 foot = 12 inches, therefore 1 cubic foot = 12 x 12 x 12 = 1 728 cubic inches 373 cubic feet therefore equal 1 728 x 373 = 644 544 cubic inches. Square root of 644 544 = 802.83598 Therefore 644 544 cubic inches in an object 1 inch deep would be 802.83598 inches square. 802.83598/12 = 66.902915 feet. To answer the question fully then: 373 cubic feet equals 66.902915 square feet at 1 inch deep.
To find the number of square feet covered by 373 cubic feet at a depth of 1 inch, you would first convert cubic feet to square feet. Since the depth is 1 inch, and there are 12 inches in a foot, 1 cubic foot would cover 12 square feet at a depth of 1 inch. Therefore, 373 cubic feet would cover 373 x 12 = 4476 square feet at a depth of 1 inch.
There are 810 cubic yards in 6 acres of land that is 3 feet deep. This calculation is based on the conversion factor that 1 acre equals 4840 square yards and that 1 cubic yard equals 27 cubic feet.
To convert square feet to cubic feet, you need to multiply by the depth. In this case, 950 square feet at 6 inches deep would be 47.5 cubic feet (950 sq ft * 0.5 ft).
To convert square feet to cubic yards for rocks or any material, you need to know the depth of the rock layer in feet. Divide the total square footage by 27 (since 1 cubic yard equals 27 cubic feet) and then multiply by the depth in feet to get the cubic yards. This will give you the volume of rock needed in cubic yards based on the square footage and depth.
There are 27 cubic feet in one cubic yard. This is because a cubic yard is a unit of volume that measures 3 feet by 3 feet by 3 feet, which equals 27 cubic feet in total.
To convert square feet to cubic feet, you would need the height or depth dimension. If you have the height measurement, you can multiply the square footage by the height to find the cubic footage. Without the height, it is not possible to directly convert square feet to cubic feet.
... cubic square what? Meters? Yards? equals in cubic feet?
The answer depends on how deep the coverage will be. River Rock weighs 2,800 LBS. per cubic yard - That's 1.4 tons per cubic yard. One ton = 2,000 LBS. 2,000 divided by 2,800 equals roughly 0.71. So one ton of river rock is roughly 0.71 cubic yards. 0.71 cubic yards covers roughly 230 square feet 1" deep 0.71 cubic yards covers roughly 115 square feet 2" deep 0.71 cubic yards covers roughly 77 square feet 3" deep 0.71 cubic yards covers roughly 57 square feet 4" deep 0.71 cubic yards covers roughly 38 square feet 5" deep
There are 810 cubic yards in 6 acres of land that is 3 feet deep. This calculation is based on the conversion factor that 1 acre equals 4840 square yards and that 1 cubic yard equals 27 cubic feet.
1 cubic yard equals 27 cubic feet. At a six inch depth 1 cubic foot will cover 2 square feet, so 27 cubic feet will cover 54 square feet.
Cubic feet is a measure of volume while square feet is a measure of area. They do not directly convert.
336 square feet X .5 feet = 168 cubic feet 168 cubic feet / 27 cubic feet per cubic yard = 6.22 cubic yards.
One cubic yard of mulch will cover approximately 160 square feet at 2" deep, so you would need approximately two cubic yards of mulch to cover 271 square feet at 2" deep.
To convert square feet to cubic feet, you need to multiply by the depth. In this case, 950 square feet at 6 inches deep would be 47.5 cubic feet (950 sq ft * 0.5 ft).
To convert square feet to cubic yards for rocks or any material, you need to know the depth of the rock layer in feet. Divide the total square footage by 27 (since 1 cubic yard equals 27 cubic feet) and then multiply by the depth in feet to get the cubic yards. This will give you the volume of rock needed in cubic yards based on the square footage and depth.
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).
154 square feet x 0.5 feet deep = 77 cubic feet. 1 yard = 3 feet so 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet. 77 cubic feet * ( 1 cubic yard / 27 cubic feet ) = 2.85 cubic yards. so buy 3.
200 cubic feet or 7.4 cubic yards