There are 90 feet in 30 yards. 30 yards x 3 feet/1 yard = 90 feet 1 yards = 3 feet
10
32.808399 feetDirect Conversion Formula10 m* 1 ft0.3048 m=32.80839895 ft
1 yard = 3 feet 1.25 yards = 3.75 feet
There are 80 square yards in a 24' by 30' area. To convert square feet to square yards, you would divide the total number of square feet by 9 (since 1 square yard is equal to 9 square feet).
By unit of length and distance and conversion ,we can say that 1 yard =3 feet in one word form
To find the ratio of 30 feet to 11 yards, we need to convert either feet to yards or yards to feet so that the units match. Since 1 yard is equal to 3 feet, we can convert 30 feet to 10 yards (30 feet ÷ 3 feet/yard = 10 yards). Therefore, the ratio of 30 feet to 11 yards is 10:11.
1 yard = 3 feet. To convert from feet to yards, divide by 3.
To convert yards to feet, multiply the number of yards you have by 3. 1 yard = 3 feet. 32 yards = 96 feet.
You can't convert that. You can convert feet to yards, or square feet to square yards.
10
to convert yards into feet, multiply the yards by three. 300 x 3=900 300 yards=900 feet.
To compare 20 feet and 10 yards, we need to convert one of the measurements to match the other. Since 1 yard is equal to 3 feet, 10 yards would be equal to 30 feet. Therefore, 10 yards is greater than 20 feet.
Multiply yards by 3 to get feet.
To convert square feet to square yards divide by 27.
270 ft squared is for example 30 ft x 9 ft. this can be converted as 10 yards x 3 yards which is 30 square yards.
Divide length by 3 (convert feet into yards), divide width by 3 (convert feet into yards) and multiply the results. or Multiply length (in feet) by width (in feet) to the area (in sq feet) and divide by 9 (convert sq feet to sq yards).
To calculate the volume of concrete needed, first convert the dimensions to feet: a 30x30 area is 30 feet by 30 feet, and 4 inches is 1/3 of a foot. The volume in cubic feet is 30 x 30 x (1/3) = 300 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 300 ÷ 27 ≈ 11.11 cubic yards. Therefore, you need approximately 11.11 yards of concrete.