There are 189 cubic feet in 7 yards of dirt. This can be calculated by multiplying the number of cubic yards by 27, since there are 27 cubic feet in a cubic yard.
The volume of the hole is 2 yards * 3 yards * 1 yard = 6 cubic yards. To convert this to cubic feet, we multiply by 27 (since 1 cubic yard = 27 cubic feet). Therefore, the volume of the hole in cubic feet is 6 cubic yards * 27 cubic feet = 162 cubic feet of dirt.
On average, there are about 0.83 cubic yards of dirt in a ton, which is equivalent to roughly 22 cubic feet. This can vary depending on the density of the dirt and how tightly it is packed.
The volume of the hole can be calculated by multiplying its length, width, and depth: 3 ft (depth) x 2 ft (width) x 10 ft (length) = 60 cubic feet. Therefore, 60 cubic feet of dirt can be removed from the hole.
The volume of the hole is 12 cubic yards. To convert this to cubic feet, you would multiply by 27 (since 1 cubic yard is equal to 27 cubic feet). Therefore, the volume of dirt in the hole is 324 cubic feet.
There are 27 cubic feet in a cubic yard. So, if you have 1 cubic yard of dirt, it is equivalent to 27 cubic feet of dirt.
14 cubic feet = 0.518 cubic yards
192000
There are 189 cubic feet in 7 yards of dirt. This can be calculated by multiplying the number of cubic yards by 27, since there are 27 cubic feet in a cubic yard.
None. It's a hole. 162 cubic feet of air. There is no dirt in a hole.
When a person speaks of a 'yard' of dirt, sand, cement or similar material, they actually mean a 'cubic yard'. A yard is a measurement of length. A cubic yard is a measurement of volume.60 (cubic) yards of dirt is the equivalent of 1,620 cubic feet of dirt.One cubic yard is measured as an amount that is 3 feet wide x 3 feet long x 3 feet high, or 27 cubic feet.60 cubic yards equals 27 cubic feet x 60, which equals 1,620 cubic feet.If you spread 60 cubic yards of dirt one foot thick you'd have an area of 1,620 square feet.If you spread this dirt 6 inches thick you'd have an area of 3,240 square feet.
118
1 cubic yard = 27 cubic feet 1 cubic foot = 0.037 cubic yard (rounded)
300 cubic feet of dirt
27 cubic feet A cubic yard of dirt = 1yd x 1yd x 1 yd OR 3ft x 3ft x 3ft
Noe but it can be filled in with 12 cubic feet of dirt
4500 cubic feet of dirt will come out.