There are 40*3*4 = 480 cubic feet.
To calculate the volume of concrete needed for the sidewalk, first convert the 4 inches thickness to feet (4 inches = 1/3 feet). Then, multiply the length (40 ft) by the width (3 ft) by the thickness in feet (1/3 ft) to get the total volume in cubic feet. This comes out to be 40 ft * 3 ft * 1/3 ft = 40 cubic feet of concrete needed for the sidewalk.
There are 0.13368 cubic feet in a gallon.
You would need 1,260 cubic feet of mulch to cover an area of 28 x 45 feet. This is calculated by multiplying the length (28 ft) by the width (45 ft) to get the total square footage (1,260 sq ft) and then multiplying by the desired depth of mulch.
To convert square feet to cubic feet, you need to know the height or depth of the area. If the height is 10 feet, then 160 square feet would equal 1600 cubic feet (160 sq ft x 10 ft = 1600 cu ft).
Cubic feet is a measure of volume while square feet is a measure of area. They do not directly convert.
32 cubic feet
624 cubic feet
20-ft x 40-ft x 3-in = 20-ft x 40-ft x 1/4 foot = 200 cubic feet = 7.41 cubic yards
You can't have cubic feet in an area. Area is for two dimentions and volume is for 3 dimentions.20ft by 20ft is 400ft2
To calculate the volume of concrete needed for the sidewalk, first convert the 4 inches thickness to feet (4 inches = 1/3 feet). Then, multiply the length (40 ft) by the width (3 ft) by the thickness in feet (1/3 ft) to get the total volume in cubic feet. This comes out to be 40 ft * 3 ft * 1/3 ft = 40 cubic feet of concrete needed for the sidewalk.
75 cubic feet
l*w*h = 40*40*40 = ft^3
120 cft / 40*12 sq ft = 0.25 ft = 4 inches.
3 yd = 1 ft → volume = 120 ft × 40 ft × 1 ft = (120 ÷ 3) yd × (40 ÷ 3) yd × (1 ÷ 3) yd = 4800 ÷ 27 yd³ = 177 7/9 cu yd ≈ 177.78 cubic yards.
There are 27 cubic feet in 1 cubic yard. This conversion is common when working with volume measurements, such as in construction or landscaping.
40 ft = 0.00757575.. miles
12 in = 1 ft → 40 in × 48 in × 60 in = (40 ÷ 12) ft × (48 × 12) ft × (60 × 12) ft = 10/3 ft × 4 ft × 5 ft = 200/3 cu ft = 66 2/3 cu ft ≈ 66.67 cu ft