answersLogoWhite

0


Best Answer

16.5 ton

User Avatar

Wiki User

14y ago
This answer is:
User Avatar
More answers
User Avatar

AnswerBot

1mo ago

If 33% of the silo is cement, then you have 16.5 tons of cement in a 50-ton silo.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: If you have 33 percent of cement in a 50 ton silo how many tons do you have in it?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

A cement truck can carry 20 tons of cement How many pounds of cement can the truck carry?

40000 POUNDS


How many metric ton is 1 million bags of cement?

Assuming each bag of cement weighs 50 kg (0.05 metric tons), 1 million bags of cement would be equivalent to 50,000 metric tons (1 million bags * 0.05 metric tons).


How many bushels of wheat will the average silo hold?

Depends on the size of your silo. however if this was a potentialy large silo you could fit a large harvest of wheat so long a you hve separated the chaff. but why do you want to know that?


What are the dangers in being buried in a silo of peas?

It is not easy to rescue a man from a silo of tons of peas... If he becomes fully buried, breathing will be impossible. It takes a skilled rescue operation.


How much does a grain silo top weigh?

The weight of a grain silo top can vary depending on its size and material. On average, a small grain silo top can weigh between 500-1,000 pounds, while larger silo tops can weigh several tons. It is recommended to consult with the manufacturer or an engineer for specific weight information.


How many tons is 180 yards?

Your question is incomplete. Yards does not convert to tons unless we know what kind of yards and if it is cement, water or what other density you are dealing with.


How many tons of cement did it take to build Hoover Dam?

A total of 3,250,000 cubic yards.


What is 0.995 percent of 174.91 metric tons?

0.995 percent of 174.91 metric tons is ~1.7403545 metric tons.


How many tons of limestone does it take to produce one ton of cement?

It typically takes about 1.6 tons of limestone to produce one ton of cement. This is because limestone is one of the key raw materials used in the production of cement, along with other materials like clay and gypsum.


What is 170 percent of 97 tons?

164.9 tons.


What percent of increase is 44000000 tons to 240000000 tons?

+445.45%


Can you convert cubic meters of concrete into tons of ballast and cement?

2.7 t