answersLogoWhite

0

What else can I help you with?

Related Questions

How many bags of cement needed to 1 tonne bag of ballast to make concrete?

To make concrete, the typical mix ratio commonly used is 1 part cement to 6 parts ballast (by volume). This means for every 1 tonne of ballast, you would need approximately 166.67 kg of cement, since 1 tonne of ballast is about 1 cubic meter, and a standard concrete mix requires 1 bag (usually 25 kg) of cement for every 0.15 cubic meters of concrete. Therefore, you would need around 6 to 7 bags of cement for 1 tonne of ballast, depending on the specific mix design.


How much ballast required for 2 cubic metres of concrete?

To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.


How much ballast and cement for footing 10m x 1m deep?

To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.


How much sand and cement do you need to cover 98 square meters?

I'll let you find the answer but you can go here and use this calculator which will convert units of measure as well for concrete ... http://www.concrete.com/calculators.htm


How much sand and cement will you need to lay 67 2x2 slabs?

To lay 67 2x2 slabs, you typically need a mix of sand and cement for the mortar or concrete. For a standard slab, you might use a 1:3 ratio of cement to sand. Assuming each slab requires around 0.1 cubic meters of concrete, you would need approximately 6.7 cubic meters of concrete total. This translates to about 1.67 cubic meters of cement and 5 cubic meters of sand, though actual requirements can vary based on specific project details and mix ratios.


How much sand and cement you need to lay 65 sqm?

To lay 65 square meters of concrete, the amount of sand and cement required depends on the thickness of the concrete layer. For a typical thickness of 10 cm, you would need approximately 0.65 cubic meters of concrete. A common mix ratio is 1 part cement to 2 parts sand to 3 parts gravel. In this case, you would need about 130 kg of cement and around 0.26 cubic meters of sand. Adjustments may be necessary based on the specific mix design and project requirements.


How much cement is needed to concrete an area 27 meters long by 1.6 meters wide with it being 75 millimeters thick?

4.23776 cubic yards


How many 40 kilograms bags of cement needed in 15 x 17 ft by 4?

To find the number of 40 kg bags of cement needed for a volume of concrete measuring 15 x 17 ft x 4 ft, first calculate the volume in cubic feet: 15 x 17 x 4 = 1020 cubic feet. Next, convert cubic feet to cubic meters (1 cubic foot = 0.0283168 cubic meters), resulting in approximately 28.8 cubic meters. A general rule of thumb is that one cubic meter of concrete requires about 350 kg of cement, so you would need about 10,080 kg of cement for this volume. Dividing 10,080 kg by 40 kg per bag gives you 252 bags of cement.


What is the volume of sand in 1 cubic meter of concrete?

Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg


How many bags of cement to make 1cubic meter of concrete for M15grade nominal mix?

In an M15 grade nominal mix, the typical ratio is 1:2:4 (cement:sand:aggregate). For 1 cubic meter of concrete, you would generally need about 7 bags of cement, as one bag of cement weighs 50 kg and approximately 0.035 cubic meters of cement is used. Therefore, the total quantity of cement needed for 1 cubic meter of M15 concrete is around 350 kg, which translates to about 7 bags.


What is the area of Ballast Point Tampa?

The area of Ballast Point - Tampa - is 9,800,000.0 square meters.


How many cement sand and gravel in 1 cubic meter mix of concrete cement?

In a typical concrete mix, the ratio of cement, sand, and gravel can vary depending on the desired strength and application. A common mix ratio is 1:2:3 (cement:sand:gravel), which translates to approximately 1 part cement, 2 parts sand, and 3 parts gravel by volume. In a 1 cubic meter mix, this would equal about 0.17 cubic meters of cement, 0.34 cubic meters of sand, and 0.5 cubic meters of gravel. Always consider specific project requirements and consult a professional for precise calculations.