2.7 t
To calculate the amount of ballast required for 2 cubic meters of concrete, you typically need to consider the concrete mix ratio. A common mix is 1 part cement, 2 parts sand, and 4 parts ballast. For 2 cubic meters of concrete, you would need approximately 1.5 cubic meters of ballast, assuming the total volume is made up of the components in that ratio. Adjustments may be necessary based on the specific mix design used.
To calculate the amount of ballast and cement needed for a footing measuring 10m x 1m deep, you first determine the volume of the footing, which is 10 cubic meters (10m x 1m x 1m). A typical concrete mix ratio is 1 part cement, 2 parts sand, and 4 parts ballast. For a standard mix, you would need approximately 1.5 cubic meters of cement, 3 cubic meters of sand, and 6 cubic meters of ballast, but this can vary based on the specific mix design and strength requirements. Always consult with a structural engineer for precise calculations tailored to your project.
I'll let you find the answer but you can go here and use this calculator which will convert units of measure as well for concrete ... http://www.concrete.com/calculators.htm
4.23776 cubic yards
Concrete is a mixture of cement, sand, stone, and water. In a cuibic meter of concrete, , there is about 0.3 cubic meters of sand, or about 475 kg
The area of Ballast Point - Tampa - is 9,800,000.0 square meters.
1 cubic meter of concrete is made up of 1,750kg ballast 300kg cement = 12 bags 25kg 150 litres water or 1,200kg chippings 350kg cement =14 bags 25kg 700kg sand 150 lit water
How many cubic meters in 1 cement bag of 50kgs
To find the volume of cement needed, first convert the depth to meters (10 cm = 0.1 m). Then, calculate the volume by multiplying the length, width, and depth: 7m x 0.95m x 0.1m = 0.665 cubic meters of cement are needed to cover the walkway.
The same as 1.60 meters. To convert to meters, divide by 100.The same as 1.60 meters. To convert to meters, divide by 100.The same as 1.60 meters. To convert to meters, divide by 100.The same as 1.60 meters. To convert to meters, divide by 100.
To convert 509 tons of asphalt concrete binder course to cubic meters, you need to know the density of the material. The density of asphalt concrete binder course can vary, but a common value is around 2.2 tons per cubic meter. Using this value, 509 tons would be approximately 231.36 cubic meters.
To convert cubic meters to metric tons, you need to multiply by the density. Cubic meters to metric tons: 1 m^3 of concrete * 2400 kg/m^3 = 2400 kg or 2.4 metric tons. Therefore, 1 cubic meter of concrete with a density of 2400 kg/m^3 is equal to 2.4 metric tons of concrete.