A 20 amp breaker can handle up to 2400 watts per hour (20 amps x 120 volts = 2400 watts).
That is 50,000 BTU per hour.
The "anemometer" is an instrument used to measure wind speed. Its output is a speed measurement, and may be expressed in any convenient unit of speed, such as 'miles per hour', 'kilometers per hour', 'feet per second', etc. Anemometers are sold in units of "each".
No, 1 mile per hour is equal to approximately 1.6 kilometers per hour, not 6.2.
1,600 kilometers per hour is 994.19 miles per hour.
Productivity
the normal urine output is 30ml per hour. so if your going to get the 24 hour output - 30x24 - it will give you 720ml per day.
at least 30ml per hour
The average concrete workers makes about $15.00 per hour. This wage varies across the country.
A 20 amp breaker can handle up to 2400 watts per hour (20 amps x 120 volts = 2400 watts).
This has no physical meaning. The correct unit for power is the watt (not watt per hour).
A concrete contractor is paid between $60 and $95 per hour.
Productivity measures (such as output per worker-hour) and wage rates adjusted for inflation in the United States are:
500 ml
40 ml per hour
100ml
In each hour the sawmill produces 500 ÷ 50 = 10 bundles. Each hour the forklift can load 10 bundles which is the output of the sawmill in an hour. Therefore it will take 3 × 4 hours = 12 hours to load all the output.