24 hrs in a day. 24 divided by 3 equals 8. 8000 times 8 equals 64000.
lathe machine hour
It would produce 146 units. However, of you are doing this problem for homework, I'd recommend learning how to do it yourself. It's no use to you if someone else does it! :)
60 minutes = 1 hour 5 hours = 5 x 60 = 300 minutes. If 3 radios are produced every minute then in 300 minutes, 3 x 300 = 900 radios are produced. 900 radios are produced in 5 hours.
60 minutes = 1 hour5 hours = 5 x 60 = 300 minutes.If 3 radios are produced every minute then in 300 minutes, 3 x 300 = 900 radios are produced.900 radios are produced in 5 hours.Read more: http://wiki.answers.com/How_many_Radios_produced_in_5_hours_rate_of_radios_in_3_per_minute#ixzz173FYF9bG
Assuming they can work in parallel, the answer should be 5. 5 men produce 1 hole per hour in the first example. At that rate, they produce 5 holes in 5 hours. The same 5 men, working at one hole per hour, should be able to produce 100 holes in 100 hours (assuming they don't need sleep, etc.)
248n
Right after she has had her calf. Colostrum is produced until 24 to 36 hours after the calf is born.
Productivity is the amount of work done or items produced divided by the amount of people or time it took to do that work. If you make 8 widgets in 2 hours that is 4 widgets per hour or 0.25 man hours per widget. You improve productivity by reducing the time per widget or making more in the same amount of time. How, you ask? Improve tools, reduce steps between operations, improve ergonomics or move faster.
If X produces 8000 articles in 4 hours, it produces (8000/4) = 2000 articles per hour. If Y produces 8000 articles in 8 hours, it produces (8000/8) = 1000 articles per hour. Therefore, the total number of article produced in six hours is: 2000+1000+2000+1000+2000+1000=9000. Machine X (which is on in the seventh hour then works for half an hour to produce 1000 more articles, so the total time is 6.5 hours.
The traditional method of cost accounting assigns the indirect costs of the factory to the production machine hours, units produced, or the direct labor hours. The disadvantage of this method is that there are more factors that contribute to the overhead therefore making this method inadequate in determining the actual costs it takes to produce a product.
A new ice machine? Ours takes 48 hours to produce a full tub of ice.
The amount of CO2 produced would depend on the type of light bulb and its wattage. As a general estimate, an incandescent bulb (60W) would produce approximately 0.9 kg of CO2 if left on for 35 hours, while an LED bulb (10W) would produce about 0.15 kg of CO2.
To determine how many softballs the machine will produce in a week, first calculate the daily production: 30 balls/hour × 8 hours/day = 240 balls/day. Next, multiply the daily production by the number of workdays in a week: 240 balls/day × 5 days/week = 1,200 balls/week. Therefore, the machine will produce a total of 1,200 softballs in a 5-day work week.
In construction it means " Machine Usage Ratio " . It is the ratio of no. of hours for which machine worked to no. of hours for which machine was available.
3 hours
10 800 000
Direct labor hours is the hours available of labor or people for example if a factory has 10 workers and in a week of 5 days of 8 hours then total direct labor hours available in week is (10*8*5) 400 hours while machine hours is how much a machine can work per day of 8 hours for example if machine need setup time of 2 hours per day then hours available per day is 6 and total hours per week will be 30.