only if you plan on having climate control down there..
5500 sq ft = 511 sq metres, approx. 5500 sq ft = 511 sq metres, approx. 5500 sq ft = 511 sq metres, approx. 5500 sq ft = 511 sq metres, approx.
360 sq m = 360 x 10.7639 sq ft = 3875 sq ft
1 sq. ft.= .09290304 sq. meters, so 320 sq. ft.= 29.728973 sq. meters.
37600 sq ft
Not unless it is finished.
Typically it would be the Length x the width of your home living space(Finished basement inc)ex.My home is a 2 story 25 ft wide and 40 ft long so 1000 sq ft x 2...2000 sq ft hope this helps
too much
only if you plan on having climate control down there..
21"x16"=336 sq inches 336 sq inches / 144 sq in per sq ft = 2.33 sq ft per tile 120 sq ft / 2.33 sq ft = 51 tiles Add 15% for breakage and cuts = 60 tiles
You can multiply them as mixed fractions, or convert both to inches, then divide by 144 (sq in / sq ft). 9 ft = 108 in, add 7 in = 115 in. 3 ft = 36 in, add 6 in = 42 in. Multiply (115 in) x (42 in) = 4830 sq in. Divide by 144 (sq in/sq ft) = 33.541667 sq ft.
19.5 ft * 13 ft = 253.5 sq feet 1 sq ft = 0.0929 sq metres so 253.5 sq feet = 23.55 sq metres.
The cost of carpet for a 800 square foot basement depends on the price of the carpet. It can cost upwards of 1.50 per square foot.
It is not entirely clear what the question is asking but the areas can be configured as80000 sq ft = 400 * 200 sq ft leaving an area of 400 * 200 sq ft, then 40000 sq ft = 400 * 100 sq ft leaving an area of 400 * 100 sq ft, then 10000 sq ft = 100 * 100 sq ft leaving an area of 300 * 100 sq ft, then 5000 sq ft = 100 * 50 sq ft leaving an area of 250 * 100 sq ft.
19 ft * 8 ft = 152 sq ft = 14.1 sq metres.19 ft * 8 ft = 152 sq ft = 14.1 sq metres.19 ft * 8 ft = 152 sq ft = 14.1 sq metres.19 ft * 8 ft = 152 sq ft = 14.1 sq metres.
11000 sq ft living space
The Average construction cost for industrial building is as follows for year 2013 Basement 1100 per sq ft. Ground floor 900 per sq ft. F.F and above 850 per sq ft. Regards Gaurav Chadha