This answer would depend on which months in the year, and also whether or not it is a leap year. A rough estimate would be 104 days.
105 days is more than 3 months, about 3.45 months (about 3 months and 2 weeks). Months are not a fixed number of days, the average is 30.4 days per month.
12 1/2 months are in 54 weeks
There are 14 days in two weeks.
There are 34 weeks and 2 days in 240 days.
2 weeks
3 months and 2 weeks.
224 days = 32 weeks = 7 months 2 weeks.
2 months is 8 to 9 weeks. It could be from 59 to 62 days, with an average of 61 days (8 weeks 5 days)
Approximating a month at 4 weeks, 7 weeks and 6 days is approximately 2 months.
Well, it depends on how long the months are, but if each month had 4 days, there would be 40 weeks in 10 months.
2 months and 11days
2 months and 11days
2 months and some extra days. The extra days depend a bit on the month lenght, but it will most likely be about 2 weeks extra. So in total 2 months and 2 weeks.
not necessarily... if you do the math, 8 weeks is only 56 days and 2 months usually has 61 days, so it doesn't follow that 8 weeks is the same as 2 months...
Since there are 12 months in a year, 9 months = 0.75 years (9/12) Therefore you have a total of 2.75 years Since there are 365 days in a year there are 1104 days in 2 years and 9 months (of course this depends on which 9 months you include)
11 months and 2 wks
1 and 2/3 weeks