4
You would need 25 (5x5).
1 (square meter) = 10.76 square feet.
1 square meter = 1 million square millimeters
There are 10 blocks in a square meter
One square meter equates to 10.76391 square feet.
the size of you!>!CK
The number of bags of cement required to cover a square meter depends on the thickness of the application and the type of mix used. Generally, for a standard concrete mix, approximately 1 bag (usually 50 kg) can cover about 0.1 to 0.15 cubic meters. Therefore, for a thickness of about 10 cm, you might need around 3 to 5 bags of cement per square meter. It's best to consult specific mix design guidelines for precise calculations.
The answer will depends on the size of the bag, how much cement it makes and the thickness of the cement layer. Since you have not bothered to share these crucial bits of information, I cannot provide a more useful answer.
A 50 kg bag of cement typically covers about 0.5 to 1 square meter when used for flooring, depending on the thickness of the layer applied and the mix ratio with aggregates. For a standard thickness of 5 cm for a concrete floor, you can expect to cover closer to 1 square meter. It's important to consider the specific project requirements and mixing proportions for more accurate estimates.
depends how deep
2500 tiles
20
One square metre is the area of a square whose sides measure exactly one metre.
83m^2
To determine the number of cement bags needed for 20mm thick plaster, first calculate the total volume of plaster required. For example, if you need to cover 1 square meter, the volume would be 0.02 cubic meters (20mm = 0.02m). Assuming a typical mix ratio of 1:6 (cement to sand), you would need about 0.033 cubic meters of cement, which is approximately one 50 kg bag of cement per 1.5 square meters of plaster at that thickness. Therefore, for 1 square meter, you would need approximately 0.67 bags of cement.
6
The amount of cement needed per square meter for a wall depends on the type of wall and the construction method. For a standard brick or block wall, approximately 0.1 to 0.15 cubic meters of cement mortar may be required per square meter. This translates to about 150 to 225 kg of cement, assuming a typical mix. It's essential to consider the specific design and materials used for precise calculations.