The answer is 576.
12/16 = 3/4 = 0.75 = 75%
6 ft. 3 in. = 75 in. 12 inches in a foot. 75 / 12 = 6 with a remainder of 3 So there is 6 feet 4 inches in 75 inches.
3/4, 6/8, and 12/16.
3/4 = 6/8 = 9/12 = 75/100
The answer is 576.
Volume of concrete needed = 4 x 12 x 1/3 = 4 x 4 = 16 cubic feet
75 percent of 12 is the same as 0.75 x 12 or 3/4 of 12. in other words the answer is 4.
12/75 reduces to 4/25 = 4 ÷ 25 = 0.16
12 / 16 = .75 = 3/4 = 75%
A cubic foot of concrete weighs ABOUT 150 pounds. 4 feet by 12 feet by 4 feet is 192 cubic feet. If you meant 4 feet by 12 feet by 4 INCHES, that would be 16 cubic feet.
100 sqft x (4/12) 33.33 cubic ft. Of concrete.
There are 16 ounces in 1 pound, so 12 ounces is 3/4 of a pound, or 75%
12.75 as a fraction is 12 75/100 or 12 3/4.
9/12 simplified is 3/4 or .75 or 75/100 or 75%
% rate:= 12/16 * 100%= 0.75 * 100%= 75%
12 x 12 feet, 4 inches deep: 1.8 cubic yards, minimum.