60 multiply 12 x 20=240 then divide 240 by 4=60

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Other Math

It takes 8 workers 15 days to complete a job. If the job has to be completed in 10 days. How many more workers are needed?

I think you need an extra 4 workers (assuming each worker works the same amount as all the other workers).


In a factory of 600 people the ratio of male workers to female workers is 32. How many workers are female?

240 of them.


Six xerox machines can copy 30000 sheets in 5 days How many machines are needed to recopy 30000 sheets in 10 days?

3 machines. You can see this easily by saying 6 machines copy 30,000 sheets in 5 days, so 1 machine must copy 5,000 sheets in 5 days. If we want to make 30,000 sheets in 10 days, that means we want to make 15,000 sheets in 5 days. If 1 machine makes 5,000 sheets in 5 days, then we need 3 machines to make 15,000 sheets in 5 days, and 3 machines to make 30,000 sheets in 10 days. So we need 3 machines. Hope this helps!


Eight workers can build a cabin in 60 hours. How many workers are needed if the cabin is to be built in 32 hours?

To determine how many workers are needed to build the cabin in 32 hours, we can use the formula: (workers) x (time) = constant. In this case, the constant is the same amount of work needed to build the cabin. So, 8 workers x 60 hours = 480 worker-hours. To build the cabin in 32 hours, we divide the constant (480 worker-hours) by the new time (32 hours) to find that 15 workers are needed to build the cabin in 32 hours.


When adding or subtracting decimals how many digits should the answer contain?

as many as needed to satisfy the accuracy needed.

Related Questions

Is it true that Using new steam-driven machines northern factory owners needed fewer workers?

Yes, to an extent. Upon the invention of the steam engine many steam powered machines were developed; these machines could perform the same tasks as many men. Whilst the machines needed to be operated and maintained by people, they required less people than would be needed for the manual labour.


How many simple machines are needed to make a compound machines?

6 simple machines.


How many simple machines are needed to make a compound machine?

6 simple machines.


Why did people not like the arrival of machines?

Because many workers lost their jobs.


What machines are needed to make coca cola?

many


Why did some people not like the arrival of machines?

Because many workers lost their jobs.


How many simple machines are needed to make a compounnd machine?

how many simple machine are needed to make a compound machine


How many workers were needed to create the Winter Palace?

1


How many airport X-ray security machines are there?

The FAA estimated that more than 2,000 of such machines would be needed for such requirements to be met.


How did the industrial revolution change working conditions for people?

machines started to replace workers. -apex


What is gang process chart?

The gang process chart is used to determine how many workers are need per machine to accomplish a particular project. It can also be used to plot the interaction between the workers and machines.


Foundry Worker?

Foundry workers are employed in the manufacturing industry and work operating the machines that make metal and plastic components for a variety of different industries, companies, and products. Foundry workers are generally divided into machine setters who setup machines to be used, and machine tenders who actually operate the devices. As there are many different items and components to be made, machines are configurable depending on the specifications for a particular product. The setter get the machine ready by installing the specific tools that are to be used for the machine, prepares materials, and inspects machine equipment prior to use. After the setter has readied a machine, an operator will continually load it with materials as it produces, monitor it, and adjust production speeds as needed to ensure it is functioning properly. There are many different types of machines that may be be used by foundry workers, including milling machines, turning machines, and planing machines. The more machines a foundry worker is trained to use properly, the more flexible they can be in work hours, schedule, and future job prospects within a company. The work environment for a foundry worker is that of a clean, well maintained, factory based setting. Due to the nature of the work, safety and precaution is the number one priority at all times for foundry workers. As a result, foundry workers must wear safety equipment such as hard harts, ear plugs, safety goggles, and steel toed boots. The work week is usually 40 hours, but there is often overtime available. It is required by most companies for foundry workers to have at least a high school diploma. All of the skills and knowledge needed for the job will be taught with hands on, supervised, on the job training. Salary for foundry workers varies depends on the company, skill level, and years experience of an individual. Additionally, the type of industry influences wages, as well as the machines that are being operated. There is also the possibility that the workers of a particular company are unionized, which can affect worker salary. The range for foundry workers salary is from $13.54 per hour to $19.55 per hour, on average.