I think you need an extra 4 workers (assuming each worker works the same amount as all the other workers).

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: It takes 8 workers 15 days to complete a job. If the job has to be completed in 10 days. How many more workers are needed?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Other Math

Two people are painting a fence one takes 3 hours to complete the job and one takes 6 hours to complete the same job how long would it take for both to complete the same job?

My somewhat educated guess would be two hours. The person who could complete the job in 3 hours could complete 2/3 of the job in two hours. The person that complete the job in 6 hours could complete 1/3 of the job in two hours. 2/3 + 1/3 = 1.


How old would the age eight be on Saturn?

Saturn takes 29 earth years for one orbit, so someone who has reach 8 years on earth (ie orbited the sun 8 times on earth) would be 8/29 ≈ 0.28 years old on Saturn, ie they would have completed about 0.28 of one orbit of Saturn around the sun. As Saturn takes about 24491 Saturn days to complete one orbit of the sun they would be 8/29 × 24491 ≈ 6756 Saturn days old compared to the 365.25 × 8 = 2922 Earth days they are.


If 6 men can do a piece of work in 14 days how many men are needed to do the work in 21 days?

Using logic, if it takes 14 days for 6 men to complete the task, then it would take 3 men 28 days. Continuing it would take one man84 days (3 x 28) to complete. So, now moving backwards, it would take 2 men 42 days (half of the 84) and 4 en 21 days (half of 42)


Which equation below represents the inverse function M which takes the number of problems completed as input and returns the numbers of minutes worked?

p(m)=m/4+7


About how many feet does a car going 70 mph travel before it comes to a stop?

It takes a car 387 feet to come to complete stop when going 70mph.

Related questions

How long will it take to complete inventory work?

"The time it takes to complete inventory work varies upon the type of inventory being completed. Ideally, it is best complete inventory as quickly, but yet as accurately and thoroughly as possible and needed, so that there are accurate numbers representing as small a time period as possible, for determining future decisions."


What would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages)


What planet has not completed an orbit since its discovery?

The planet Neptune has not completed a full orbit since its discovery in 1846. It takes Neptune approximately 165 Earth years to complete one orbit around the Sun, so it has only completed a fraction of its first orbit since its discovery.


What time is needed for Neptune to revolve around the sun?

Neptune takes about 164.8 years to complete one orbit around the sun.


What would be a good name for the function that takes the length of a race and returns the time needed to complete it?

time(length)Money(time)


Which would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages) *ER7*(:


In Mafia Wars enforcer level should you complete job prep before doing the jobs?

The prep jobs must be completed along with the other jobs in order to master each level of the tier. Otherwise, it is only necessary to complete them as the items are needed. You will need to return to the wiretap job for more wiretaps many more times than it takes to master the job.


What education must one complete in order to become a marketing consultant?

Four years of college at the least must be completed before a degree is earned to become a marketing consultant. An associates degree takes four years to complete.


What do you understand by Rotation of earth?

I understand that it takes one full day or 24 hrs. for the earth to complete rotation, and each 12 hrs. the earth has completed half a turn.


How long does a Breathalyzer test take to be completed?

a breathalyzer generally takes 1 minute to complete. This included a 10-45 second warm up, and a 5 second test.


Who takes part on the may day celebration of the international workers day?

workers


What education is needed to become an arachnologist?

An arachnologist works with arachnid or spiders. A bachelor's degree in biology is required and takes four years to complete.