I think you need an extra 4 workers (assuming each worker works the same amount as all the other workers).

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Other Math

Eight workers can build a cabin in 60 hours. How many workers are needed if the cabin is to be built in 32 hours?

Since we are given no information to the contrary, the following discussion assumes that all men are created equal, and every worker accomplishes the same amount of work in the same amount of time. Since 8 workers can build a cabin in 60 hours, the job comprises (8 man) times (60 hours) = 480 man-hours of labor. That doesn't change. Now however, 480 man-hours of labor must be completed in 32 hours. The number of workers required to accomplish this is (480 man-hours) divided by (32 hours) = 15 man.


Two people are painting a fence one takes 3 hours to complete the job and one takes 6 hours to complete the same job how long would it take for both to complete the same job?

My somewhat educated guess would be two hours. The person who could complete the job in 3 hours could complete 2/3 of the job in two hours. The person that complete the job in 6 hours could complete 1/3 of the job in two hours. 2/3 + 1/3 = 1.


The what indicates an action that will have been completed before another action takes place?

The term "future perfect" indicates an action that will have been completed before another action takes place. It is formed using "will have" followed by the past participle of the verb. For example, in the sentence "By next year, I will have graduated before my sister starts college," the future perfect tense illustrates the completion of graduation prior to the sister's college start.


How old would the age eight be on Saturn?

Saturn takes 29 earth years for one orbit, so someone who has reach 8 years on earth (ie orbited the sun 8 times on earth) would be 8/29 ≈ 0.28 years old on Saturn, ie they would have completed about 0.28 of one orbit of Saturn around the sun. As Saturn takes about 24491 Saturn days to complete one orbit of the sun they would be 8/29 × 24491 ≈ 6756 Saturn days old compared to the 365.25 × 8 = 2922 Earth days they are.


If 6 men can do a piece of work in 14 days how many men are needed to do the work in 21 days?

Using logic, if it takes 14 days for 6 men to complete the task, then it would take 3 men 28 days. Continuing it would take one man84 days (3 x 28) to complete. So, now moving backwards, it would take 2 men 42 days (half of the 84) and 4 en 21 days (half of 42)

Related Questions

How long will it take to complete inventory work?

"The time it takes to complete inventory work varies upon the type of inventory being completed. Ideally, it is best complete inventory as quickly, but yet as accurately and thoroughly as possible and needed, so that there are accurate numbers representing as small a time period as possible, for determining future decisions."


Which planet has not completed an orbit around the sun since its discovery?

Neptune (the eighth and outermost planet) was discovered on September 23, 1846. It takes 164.79 Earth years to complete one orbit and will therefore only complete its first orbit since its discovery in 2011. It is also worth noting that while Pluto is not longer regarded as a planet (it is now a minor planet) it was discovered in 1930 and takes 248.09 Earth years to complete an orbit.


How long does it take to complete a stool culture?

Typically, it takes about 2-3 days to complete a stool culture test. This timeline includes the time needed for the sample collection, transportation to the lab, incubation of the sample, and analysis of the culture for bacterial growth. Results are usually reported to the healthcare provider within a few days after the test is completed.


What would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages)


What planet has not completed an orbit since its discovery?

The planet Neptune has not completed a full orbit since its discovery in 1846. It takes Neptune approximately 165 Earth years to complete one orbit around the Sun, so it has only completed a fraction of its first orbit since its discovery.


In Mafia Wars enforcer level should you complete job prep before doing the jobs?

The prep jobs must be completed along with the other jobs in order to master each level of the tier. Otherwise, it is only necessary to complete them as the items are needed. You will need to return to the wiretap job for more wiretaps many more times than it takes to master the job.


What education must one complete in order to become a marketing consultant?

Four years of college at the least must be completed before a degree is earned to become a marketing consultant. An associates degree takes four years to complete.


What time is needed for Neptune to revolve around the sun?

Neptune takes about 164.8 years to complete one orbit around the sun.


Which would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages) *ER7*(:


What would be a good name for the function that takes the length of a race and returns the time needed to complete it?

time(length)Money(time)


How long does a Breathalyzer test take to be completed?

a breathalyzer generally takes 1 minute to complete. This included a 10-45 second warm up, and a 5 second test.


What do you understand by Rotation of earth?

I understand that it takes one full day or 24 hrs. for the earth to complete rotation, and each 12 hrs. the earth has completed half a turn.