answersLogoWhite

0

I think you need an extra 4 workers (assuming each worker works the same amount as all the other workers).

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Other Math

Eight workers can build a cabin in 60 hours. How many workers are needed if the cabin is to be built in 32 hours?

To determine how many workers are needed to build the cabin in 32 hours, we can use the formula: (workers) x (time) = constant. In this case, the constant is the same amount of work needed to build the cabin. So, 8 workers x 60 hours = 480 worker-hours. To build the cabin in 32 hours, we divide the constant (480 worker-hours) by the new time (32 hours) to find that 15 workers are needed to build the cabin in 32 hours.


Two people are painting a fence one takes 3 hours to complete the job and one takes 6 hours to complete the same job how long would it take for both to complete the same job?

My somewhat educated guess would be two hours. The person who could complete the job in 3 hours could complete 2/3 of the job in two hours. The person that complete the job in 6 hours could complete 1/3 of the job in two hours. 2/3 + 1/3 = 1.


How old would the age eight be on Saturn?

Saturn takes 29 earth years for one orbit, so someone who has reach 8 years on earth (ie orbited the sun 8 times on earth) would be 8/29 ≈ 0.28 years old on Saturn, ie they would have completed about 0.28 of one orbit of Saturn around the sun. As Saturn takes about 24491 Saturn days to complete one orbit of the sun they would be 8/29 × 24491 ≈ 6756 Saturn days old compared to the 365.25 × 8 = 2922 Earth days they are.


If 6 men can do a piece of work in 14 days how many men are needed to do the work in 21 days?

Using logic, if it takes 14 days for 6 men to complete the task, then it would take 3 men 28 days. Continuing it would take one man84 days (3 x 28) to complete. So, now moving backwards, it would take 2 men 42 days (half of the 84) and 4 en 21 days (half of 42)


Which equation below represents the inverse function M which takes the number of problems completed as input and returns the numbers of minutes worked?

p(m)=m/4+7

Related Questions

How long will it take to complete inventory work?

"The time it takes to complete inventory work varies upon the type of inventory being completed. Ideally, it is best complete inventory as quickly, but yet as accurately and thoroughly as possible and needed, so that there are accurate numbers representing as small a time period as possible, for determining future decisions."


Which planet has not completed an orbit around the sun since its discovery?

Neptune has not completed a full orbit around the Sun since its discovery in 1846. It takes Neptune about 165 years to complete one orbit around the Sun, so it will not have completed a full orbit since its discovery in the 19th century.


How long does it take to complete a stool culture?

Typically, it takes about 2-3 days to complete a stool culture test. This timeline includes the time needed for the sample collection, transportation to the lab, incubation of the sample, and analysis of the culture for bacterial growth. Results are usually reported to the healthcare provider within a few days after the test is completed.


What would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages)


What planet has not completed an orbit since its discovery?

The planet Neptune has not completed a full orbit since its discovery in 1846. It takes Neptune approximately 165 Earth years to complete one orbit around the Sun, so it has only completed a fraction of its first orbit since its discovery.


What time is needed for Neptune to revolve around the sun?

Neptune takes about 164.8 years to complete one orbit around the sun.


Which would be a good name for the function that takes the length of a reading assignment and returns the time needed to complete it?

Time(pages) *ER7*(:


What would be a good name for the function that takes the length of a race and returns the time needed to complete it?

time(length)Money(time)


What education must one complete in order to become a marketing consultant?

Four years of college at the least must be completed before a degree is earned to become a marketing consultant. An associates degree takes four years to complete.


In Mafia Wars enforcer level should you complete job prep before doing the jobs?

The prep jobs must be completed along with the other jobs in order to master each level of the tier. Otherwise, it is only necessary to complete them as the items are needed. You will need to return to the wiretap job for more wiretaps many more times than it takes to master the job.


Who takes part on the may day celebration of the international workers day?

workers


How long does a Breathalyzer test take to be completed?

a breathalyzer generally takes 1 minute to complete. This included a 10-45 second warm up, and a 5 second test.